{"id":3006,"date":"2026-09-05T08:23:48","date_gmt":"2026-09-05T06:23:48","guid":{"rendered":"https:\/\/energianucleare.eu\/tgi-solar-and-tgi-amiron-open-a-us-kazakhstan-technology-corridor\/"},"modified":"2026-09-05T08:23:48","modified_gmt":"2026-09-05T06:23:48","slug":"tgi-solar-and-tgi-amiron-open-a-us-kazakhstan-technology-corridor","status":"publish","type":"post","link":"https:\/\/energianucleare.eu\/en\/tgi-solar-and-tgi-amiron-open-a-us-kazakhstan-technology-corridor\/","title":{"rendered":"TGI Solar and TGI AMIRON Open a US-Kazakhstan Technology Corridor"},"content":{"rendered":"<p><strong>TGI Solar Power Group<\/strong> (OTC PINK: TSPG) has officially registered its subsidiary <strong>TGI AMIRON Inc.<\/strong> in Kazakhstan and begun operational deployment, with its base established at the Port of Aktau. The announcement, dated September 4, 2026, outlines a technology corridor between the United States and Kazakhstan spanning digital infrastructure, natural resources, and \u2014 with increasing strategic weight \u2014 the transition toward small modular reactors.<\/p>\n<p>The flagship initiative is a data center campus in <strong>Ekibastuz<\/strong>, in northern Kazakhstan. The TGI AMIRON joint venture \u2014 formed through an agreement between TGI Group and AMIRON GROUP, a Kazakh industrial software and hardware integrator \u2014 targets an initial capacity of between 50 and 120 megawatts, within an overall investment framework of <strong>$1.29 billion<\/strong>. The infrastructure is designed to achieve Tier IV certification, incorporates a 300-megawatt energy storage system, and explicitly contemplates <strong>small modular reactors (SMRs)<\/strong> and green hydrogen as long-term power sources. This is no minor footnote: it means the entire energy architecture of the campus has been engineered from the ground up to accommodate next-generation nuclear power.<\/p>\n<p>Kazakhstan is the world&#8217;s largest uranium producer \u2014 a fact that is not merely geographical, but the strategic premise underpinning the entire operation. The country holds more than 9,000 registered mineral deposits, including the Zhana Kazakhstan site in the Karaganda region, with an estimated potential of around 935,000 tonnes of rare earth oxides. Government policy under President <strong>Kassym-Jomart Tokayev<\/strong>&#8216;s &#8220;New Kazakhstan&#8221; agenda prioritizes domestic value-added processing over raw resource extraction. For TGI AMIRON, this translates into a state partner with aligned objectives: adding value in-country rather than shipping unprocessed ore abroad.<\/p>\n<p>On the digital side, the expansion dovetails with national initiatives coordinated by Kazakhstan&#8217;s Ministry of Artificial Intelligence and Digital Development. The project integrates high-performance computing, memory-centric computing architectures, and quantum research, with an operational horizon set for 2030. The choice of the Port of Aktau as the first operational base is deliberate: Aktau is Kazakhstan&#8217;s primary logistics hub on the Caspian Sea, a crossroads connecting Europe, Central Asia, and the Middle East.<\/p>\n<p>The formal strategic alliance between TGI Group and AMIRON GROUP was signed in March 2026, with a stated goal of driving a &#8220;green digital transformation&#8221; across the region. Since then, the scope has expanded rapidly. The US-Kazakhstan corridor is not simply about data or minerals: it is about who will control Central Asia&#8217;s critical infrastructure over the next decade. Should SMRs be formally incorporated into the energy planning for the Ekibastuz campus, TGI AMIRON could become one of the first tangible real-world cases of modular nuclear integration within digital infrastructure at industrial scale \u2014 in a region historically reliant on coal.<\/p>\n","protected":false},"excerpt":{"rendered":"<p>TGI Solar Power Group has registered subsidiary TGI AMIRON Inc. in Kazakhstan and launched operations at the Port of Aktau, targeting digital infrastructure, SMRs, and rare earth resources. The project includes a $1.29 billion data center campus in Ekibastuz with a formal assessment of modular reactor integration.<\/p>\n","protected":false},"author":25,"featured_media":3003,"comment_status":"open","ping_status":"open","sticky":false,"template":"","format":"standard","meta":{"_acf_changed":false,"footnotes":""},"categories":[],"tags":[],"class_list":["post-3006","post","type-post","status-publish","format-standard","has-post-thumbnail","hentry"],"acf":[],"yoast_head":"<!-- This site is optimized with the Yoast SEO plugin v28.4 - https:\/\/yoast.com\/product\/yoast-seo-wordpress\/ -->\n<title>TGI Solar and TGI AMIRON Open a US-Kazakhstan Technology Corridor - Energia nucleare<\/title>\n<meta name=\"description\" content=\"TGI Solar and TGI AMIRON launch a US-Kazakhstan tech corridor with a $1.29B data center, SMRs, and rare earths. Operations based at Port of Aktau.\" \/>\n<meta name=\"robots\" content=\"index, follow, max-snippet:-1, max-image-preview:large, max-video-preview:-1\" \/>\n<link rel=\"canonical\" href=\"https:\/\/energianucleare.eu\/en\/tgi-solar-and-tgi-amiron-open-a-us-kazakhstan-technology-corridor\/\" \/>\n<meta property=\"og:locale\" content=\"en_US\" \/>\n<meta property=\"og:type\" content=\"article\" \/>\n<meta property=\"og:title\" content=\"TGI Solar and TGI AMIRON Open a US-Kazakhstan Technology Corridor - Energia nucleare\" \/>\n<meta property=\"og:description\" content=\"TGI Solar and TGI AMIRON launch a US-Kazakhstan tech corridor with a $1.29B data center, SMRs, and rare earths. Operations based at Port of Aktau.\" \/>\n<meta property=\"og:url\" content=\"https:\/\/energianucleare.eu\/en\/tgi-solar-and-tgi-amiron-open-a-us-kazakhstan-technology-corridor\/\" \/>\n<meta property=\"og:site_name\" content=\"Energia nucleare\" \/>\n<meta property=\"article:published_time\" content=\"2026-09-05T06:23:48+00:00\" \/>\n<meta property=\"og:image\" content=\"https:\/\/energianucleare.eu\/wp-content\/uploads\/2026\/09\/publish_56306770f79f4ed2b038d468be6ded94.png\" \/>\n\t<meta property=\"og:image:width\" content=\"1536\" \/>\n\t<meta property=\"og:image:height\" content=\"1024\" \/>\n\t<meta property=\"og:image:type\" content=\"image\/png\" \/>\n<meta name=\"author\" content=\"Redazione Energia Nucleare\" \/>\n<meta name=\"twitter:card\" content=\"summary_large_image\" \/>\n<meta name=\"twitter:label1\" content=\"Written by\" \/>\n\t<meta name=\"twitter:data1\" content=\"Redazione Energia Nucleare\" \/>\n\t<meta name=\"twitter:label2\" content=\"Est. reading time\" \/>\n\t<meta name=\"twitter:data2\" content=\"2 minutes\" \/>\n<script type=\"application\/ld+json\" class=\"yoast-schema-graph\">{\"@context\":\"https:\\\/\\\/schema.org\",\"@graph\":[{\"@type\":\"Article\",\"@id\":\"https:\\\/\\\/energianucleare.eu\\\/en\\\/tgi-solar-and-tgi-amiron-open-a-us-kazakhstan-technology-corridor\\\/#article\",\"isPartOf\":{\"@id\":\"https:\\\/\\\/energianucleare.eu\\\/en\\\/tgi-solar-and-tgi-amiron-open-a-us-kazakhstan-technology-corridor\\\/\"},\"author\":{\"name\":\"Redazione Energia Nucleare\",\"@id\":\"https:\\\/\\\/energianucleare.eu\\\/en\\\/#\\\/schema\\\/person\\\/2c3f466ad139658dfa60c575cf287fb7\"},\"headline\":\"TGI Solar and TGI AMIRON Open a US-Kazakhstan Technology Corridor\",\"datePublished\":\"2026-09-05T06:23:48+00:00\",\"mainEntityOfPage\":{\"@id\":\"https:\\\/\\\/energianucleare.eu\\\/en\\\/tgi-solar-and-tgi-amiron-open-a-us-kazakhstan-technology-corridor\\\/\"},\"wordCount\":438,\"commentCount\":0,\"image\":{\"@id\":\"https:\\\/\\\/energianucleare.eu\\\/en\\\/tgi-solar-and-tgi-amiron-open-a-us-kazakhstan-technology-corridor\\\/#primaryimage\"},\"thumbnailUrl\":\"https:\\\/\\\/energianucleare.eu\\\/wp-content\\\/uploads\\\/2026\\\/09\\\/publish_56306770f79f4ed2b038d468be6ded94.png\",\"inLanguage\":\"en-US\",\"potentialAction\":[{\"@type\":\"CommentAction\",\"name\":\"Comment\",\"target\":[\"https:\\\/\\\/energianucleare.eu\\\/en\\\/tgi-solar-and-tgi-amiron-open-a-us-kazakhstan-technology-corridor\\\/#respond\"]}]},{\"@type\":\"WebPage\",\"@id\":\"https:\\\/\\\/energianucleare.eu\\\/en\\\/tgi-solar-and-tgi-amiron-open-a-us-kazakhstan-technology-corridor\\\/\",\"url\":\"https:\\\/\\\/energianucleare.eu\\\/en\\\/tgi-solar-and-tgi-amiron-open-a-us-kazakhstan-technology-corridor\\\/\",\"name\":\"TGI Solar and TGI AMIRON Open a US-Kazakhstan Technology Corridor - Energia nucleare\",\"isPartOf\":{\"@id\":\"https:\\\/\\\/energianucleare.eu\\\/en\\\/#website\"},\"primaryImageOfPage\":{\"@id\":\"https:\\\/\\\/energianucleare.eu\\\/en\\\/tgi-solar-and-tgi-amiron-open-a-us-kazakhstan-technology-corridor\\\/#primaryimage\"},\"image\":{\"@id\":\"https:\\\/\\\/energianucleare.eu\\\/en\\\/tgi-solar-and-tgi-amiron-open-a-us-kazakhstan-technology-corridor\\\/#primaryimage\"},\"thumbnailUrl\":\"https:\\\/\\\/energianucleare.eu\\\/wp-content\\\/uploads\\\/2026\\\/09\\\/publish_56306770f79f4ed2b038d468be6ded94.png\",\"datePublished\":\"2026-09-05T06:23:48+00:00\",\"author\":{\"@id\":\"https:\\\/\\\/energianucleare.eu\\\/en\\\/#\\\/schema\\\/person\\\/2c3f466ad139658dfa60c575cf287fb7\"},\"description\":\"TGI Solar and TGI AMIRON launch a US-Kazakhstan tech corridor with a $1.29B data center, SMRs, and rare earths. Operations based at Port of Aktau.\",\"breadcrumb\":{\"@id\":\"https:\\\/\\\/energianucleare.eu\\\/en\\\/tgi-solar-and-tgi-amiron-open-a-us-kazakhstan-technology-corridor\\\/#breadcrumb\"},\"inLanguage\":\"en-US\",\"potentialAction\":[{\"@type\":\"ReadAction\",\"target\":[\"https:\\\/\\\/energianucleare.eu\\\/en\\\/tgi-solar-and-tgi-amiron-open-a-us-kazakhstan-technology-corridor\\\/\"]}]},{\"@type\":\"ImageObject\",\"inLanguage\":\"en-US\",\"@id\":\"https:\\\/\\\/energianucleare.eu\\\/en\\\/tgi-solar-and-tgi-amiron-open-a-us-kazakhstan-technology-corridor\\\/#primaryimage\",\"url\":\"https:\\\/\\\/energianucleare.eu\\\/wp-content\\\/uploads\\\/2026\\\/09\\\/publish_56306770f79f4ed2b038d468be6ded94.png\",\"contentUrl\":\"https:\\\/\\\/energianucleare.eu\\\/wp-content\\\/uploads\\\/2026\\\/09\\\/publish_56306770f79f4ed2b038d468be6ded94.png\",\"width\":1536,\"height\":1024},{\"@type\":\"BreadcrumbList\",\"@id\":\"https:\\\/\\\/energianucleare.eu\\\/en\\\/tgi-solar-and-tgi-amiron-open-a-us-kazakhstan-technology-corridor\\\/#breadcrumb\",\"itemListElement\":[{\"@type\":\"ListItem\",\"position\":1,\"name\":\"Home\",\"item\":\"https:\\\/\\\/energianucleare.eu\\\/en\\\/\"},{\"@type\":\"ListItem\",\"position\":2,\"name\":\"TGI Solar and TGI AMIRON Open a US-Kazakhstan Technology Corridor\"}]},{\"@type\":\"WebSite\",\"@id\":\"https:\\\/\\\/energianucleare.eu\\\/en\\\/#website\",\"url\":\"https:\\\/\\\/energianucleare.eu\\\/en\\\/\",\"name\":\"Energia nucleare\",\"description\":\"Notizie sul nucleare\",\"potentialAction\":[{\"@type\":\"SearchAction\",\"target\":{\"@type\":\"EntryPoint\",\"urlTemplate\":\"https:\\\/\\\/energianucleare.eu\\\/en\\\/?s={search_term_string}\"},\"query-input\":{\"@type\":\"PropertyValueSpecification\",\"valueRequired\":true,\"valueName\":\"search_term_string\"}}],\"inLanguage\":\"en-US\"},{\"@type\":\"Person\",\"@id\":\"https:\\\/\\\/energianucleare.eu\\\/en\\\/#\\\/schema\\\/person\\\/2c3f466ad139658dfa60c575cf287fb7\",\"name\":\"Redazione Energia Nucleare\",\"image\":{\"@type\":\"ImageObject\",\"inLanguage\":\"en-US\",\"@id\":\"https:\\\/\\\/secure.gravatar.com\\\/avatar\\\/f7573bf636adfceb968c63d469c0889af0a78eb4935f321c17f76df121e056a6?s=96&d=mm&r=g\",\"url\":\"https:\\\/\\\/secure.gravatar.com\\\/avatar\\\/f7573bf636adfceb968c63d469c0889af0a78eb4935f321c17f76df121e056a6?s=96&d=mm&r=g\",\"contentUrl\":\"https:\\\/\\\/secure.gravatar.com\\\/avatar\\\/f7573bf636adfceb968c63d469c0889af0a78eb4935f321c17f76df121e056a6?s=96&d=mm&r=g\",\"caption\":\"Redazione Energia Nucleare\"},\"url\":\"https:\\\/\\\/energianucleare.eu\\\/en\\\/author\\\/redazione\\\/\"}]}<\/script>\n<!-- \/ Yoast SEO plugin. -->","yoast_head_json":{"title":"TGI Solar and TGI AMIRON Open a US-Kazakhstan Technology Corridor - Energia nucleare","description":"TGI Solar and TGI AMIRON launch a US-Kazakhstan tech corridor with a $1.29B data center, SMRs, and rare earths. Operations based at Port of Aktau.","robots":{"index":"index","follow":"follow","max-snippet":"max-snippet:-1","max-image-preview":"max-image-preview:large","max-video-preview":"max-video-preview:-1"},"canonical":"https:\/\/energianucleare.eu\/en\/tgi-solar-and-tgi-amiron-open-a-us-kazakhstan-technology-corridor\/","og_locale":"en_US","og_type":"article","og_title":"TGI Solar and TGI AMIRON Open a US-Kazakhstan Technology Corridor - Energia nucleare","og_description":"TGI Solar and TGI AMIRON launch a US-Kazakhstan tech corridor with a $1.29B data center, SMRs, and rare earths. Operations based at Port of Aktau.","og_url":"https:\/\/energianucleare.eu\/en\/tgi-solar-and-tgi-amiron-open-a-us-kazakhstan-technology-corridor\/","og_site_name":"Energia nucleare","article_published_time":"2026-09-05T06:23:48+00:00","og_image":[{"width":1536,"height":1024,"url":"https:\/\/energianucleare.eu\/wp-content\/uploads\/2026\/09\/publish_56306770f79f4ed2b038d468be6ded94.png","type":"image\/png"}],"author":"Redazione Energia Nucleare","twitter_card":"summary_large_image","twitter_misc":{"Written by":"Redazione Energia Nucleare","Est. reading time":"2 minutes"},"schema":{"@context":"https:\/\/schema.org","@graph":[{"@type":"Article","@id":"https:\/\/energianucleare.eu\/en\/tgi-solar-and-tgi-amiron-open-a-us-kazakhstan-technology-corridor\/#article","isPartOf":{"@id":"https:\/\/energianucleare.eu\/en\/tgi-solar-and-tgi-amiron-open-a-us-kazakhstan-technology-corridor\/"},"author":{"name":"Redazione Energia Nucleare","@id":"https:\/\/energianucleare.eu\/en\/#\/schema\/person\/2c3f466ad139658dfa60c575cf287fb7"},"headline":"TGI Solar and TGI AMIRON Open a US-Kazakhstan Technology Corridor","datePublished":"2026-09-05T06:23:48+00:00","mainEntityOfPage":{"@id":"https:\/\/energianucleare.eu\/en\/tgi-solar-and-tgi-amiron-open-a-us-kazakhstan-technology-corridor\/"},"wordCount":438,"commentCount":0,"image":{"@id":"https:\/\/energianucleare.eu\/en\/tgi-solar-and-tgi-amiron-open-a-us-kazakhstan-technology-corridor\/#primaryimage"},"thumbnailUrl":"https:\/\/energianucleare.eu\/wp-content\/uploads\/2026\/09\/publish_56306770f79f4ed2b038d468be6ded94.png","inLanguage":"en-US","potentialAction":[{"@type":"CommentAction","name":"Comment","target":["https:\/\/energianucleare.eu\/en\/tgi-solar-and-tgi-amiron-open-a-us-kazakhstan-technology-corridor\/#respond"]}]},{"@type":"WebPage","@id":"https:\/\/energianucleare.eu\/en\/tgi-solar-and-tgi-amiron-open-a-us-kazakhstan-technology-corridor\/","url":"https:\/\/energianucleare.eu\/en\/tgi-solar-and-tgi-amiron-open-a-us-kazakhstan-technology-corridor\/","name":"TGI Solar and TGI AMIRON Open a US-Kazakhstan Technology Corridor - Energia nucleare","isPartOf":{"@id":"https:\/\/energianucleare.eu\/en\/#website"},"primaryImageOfPage":{"@id":"https:\/\/energianucleare.eu\/en\/tgi-solar-and-tgi-amiron-open-a-us-kazakhstan-technology-corridor\/#primaryimage"},"image":{"@id":"https:\/\/energianucleare.eu\/en\/tgi-solar-and-tgi-amiron-open-a-us-kazakhstan-technology-corridor\/#primaryimage"},"thumbnailUrl":"https:\/\/energianucleare.eu\/wp-content\/uploads\/2026\/09\/publish_56306770f79f4ed2b038d468be6ded94.png","datePublished":"2026-09-05T06:23:48+00:00","author":{"@id":"https:\/\/energianucleare.eu\/en\/#\/schema\/person\/2c3f466ad139658dfa60c575cf287fb7"},"description":"TGI Solar and TGI AMIRON launch a US-Kazakhstan tech corridor with a $1.29B data center, SMRs, and rare earths. Operations based at Port of Aktau.","breadcrumb":{"@id":"https:\/\/energianucleare.eu\/en\/tgi-solar-and-tgi-amiron-open-a-us-kazakhstan-technology-corridor\/#breadcrumb"},"inLanguage":"en-US","potentialAction":[{"@type":"ReadAction","target":["https:\/\/energianucleare.eu\/en\/tgi-solar-and-tgi-amiron-open-a-us-kazakhstan-technology-corridor\/"]}]},{"@type":"ImageObject","inLanguage":"en-US","@id":"https:\/\/energianucleare.eu\/en\/tgi-solar-and-tgi-amiron-open-a-us-kazakhstan-technology-corridor\/#primaryimage","url":"https:\/\/energianucleare.eu\/wp-content\/uploads\/2026\/09\/publish_56306770f79f4ed2b038d468be6ded94.png","contentUrl":"https:\/\/energianucleare.eu\/wp-content\/uploads\/2026\/09\/publish_56306770f79f4ed2b038d468be6ded94.png","width":1536,"height":1024},{"@type":"BreadcrumbList","@id":"https:\/\/energianucleare.eu\/en\/tgi-solar-and-tgi-amiron-open-a-us-kazakhstan-technology-corridor\/#breadcrumb","itemListElement":[{"@type":"ListItem","position":1,"name":"Home","item":"https:\/\/energianucleare.eu\/en\/"},{"@type":"ListItem","position":2,"name":"TGI Solar and TGI AMIRON Open a US-Kazakhstan Technology Corridor"}]},{"@type":"WebSite","@id":"https:\/\/energianucleare.eu\/en\/#website","url":"https:\/\/energianucleare.eu\/en\/","name":"Energia nucleare","description":"Notizie sul nucleare","potentialAction":[{"@type":"SearchAction","target":{"@type":"EntryPoint","urlTemplate":"https:\/\/energianucleare.eu\/en\/?s={search_term_string}"},"query-input":{"@type":"PropertyValueSpecification","valueRequired":true,"valueName":"search_term_string"}}],"inLanguage":"en-US"},{"@type":"Person","@id":"https:\/\/energianucleare.eu\/en\/#\/schema\/person\/2c3f466ad139658dfa60c575cf287fb7","name":"Redazione Energia Nucleare","image":{"@type":"ImageObject","inLanguage":"en-US","@id":"https:\/\/secure.gravatar.com\/avatar\/f7573bf636adfceb968c63d469c0889af0a78eb4935f321c17f76df121e056a6?s=96&d=mm&r=g","url":"https:\/\/secure.gravatar.com\/avatar\/f7573bf636adfceb968c63d469c0889af0a78eb4935f321c17f76df121e056a6?s=96&d=mm&r=g","contentUrl":"https:\/\/secure.gravatar.com\/avatar\/f7573bf636adfceb968c63d469c0889af0a78eb4935f321c17f76df121e056a6?s=96&d=mm&r=g","caption":"Redazione Energia Nucleare"},"url":"https:\/\/energianucleare.eu\/en\/author\/redazione\/"}]}},"_links":{"self":[{"href":"https:\/\/energianucleare.eu\/en\/wp-json\/wp\/v2\/posts\/3006","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/energianucleare.eu\/en\/wp-json\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/energianucleare.eu\/en\/wp-json\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"https:\/\/energianucleare.eu\/en\/wp-json\/wp\/v2\/users\/25"}],"replies":[{"embeddable":true,"href":"https:\/\/energianucleare.eu\/en\/wp-json\/wp\/v2\/comments?post=3006"}],"version-history":[{"count":0,"href":"https:\/\/energianucleare.eu\/en\/wp-json\/wp\/v2\/posts\/3006\/revisions"}],"wp:featuredmedia":[{"embeddable":true,"href":"https:\/\/energianucleare.eu\/en\/wp-json\/wp\/v2\/media\/3003"}],"wp:attachment":[{"href":"https:\/\/energianucleare.eu\/en\/wp-json\/wp\/v2\/media?parent=3006"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/energianucleare.eu\/en\/wp-json\/wp\/v2\/categories?post=3006"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/energianucleare.eu\/en\/wp-json\/wp\/v2\/tags?post=3006"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}