{"id":3590,"date":"2026-10-01T20:19:49","date_gmt":"2026-10-01T18:19:49","guid":{"rendered":"https:\/\/energianucleare.eu\/deep-fission-to-brief-investors-on-october-20-about-underground-gravity-reactor\/"},"modified":"2026-10-01T20:19:49","modified_gmt":"2026-10-01T18:19:49","slug":"deep-fission-to-brief-investors-on-october-20-about-underground-gravity-reactor","status":"publish","type":"post","link":"https:\/\/energianucleare.eu\/en\/deep-fission-to-brief-investors-on-october-20-about-underground-gravity-reactor\/","title":{"rendered":"Deep Fission to Brief Investors on October 20 About Underground Gravity Reactor"},"content":{"rendered":"<p><strong>Deep Fission<\/strong> (Nasdaq: FISN) has scheduled a business update call for Tuesday, October 20, 2026, at 11:00 AM ET. The timing is deliberate: the pilot site in Kansas is moving forward, and recent months have delivered concrete results that management is ready to share with the market.<\/p>\n<p>The project centers on the <strong>Gravity Nuclear Reactor<\/strong>, a small pressurized water modular reactor designed to operate roughly one mile underground. The technology draws on three well-established industries: deep drilling from oil and gas, heat transfer principles from geothermal energy, and conventional PWR reactor design. Each unit generates <strong>15 MWe<\/strong> using standard LEU fuel. The geometry is that of a cylinder approximately 9 meters tall \u2014 slim enough to be lowered into a borehole just under one meter in diameter. Ten reactors clustered on a single site reach 150 MWe; one hundred scale up to 1.5 GWe, while occupying a fraction of the land required by a conventional nuclear plant.<\/p>\n<p>The reference site is <strong>Great Plains Industrial Park<\/strong> in Parsons, Kansas, where Deep Fission broke ground in December 2025. The first data acquisition well has already reached 6,000 feet \u2014 more than a mile \u2014 and a reactor canister prototype has been delivered to the site. In September 2026, the company completed a key demonstration: a 6-meter canister, a full-scale, non-nuclear replica of the vessel that will house the reactor core, was lowered to a depth of 30 meters into an 86-centimeter-diameter borehole, aligned, and retrieved. The entire operation was carried out using standard commercial equipment, with no components specifically engineered for the nuclear industry.<\/p>\n<p>The advantages of deep placement go well beyond symbolism. At one mile below the surface, the overlying water column generates roughly <strong>160 atmospheres of pressure<\/strong> \u2014 the same operating condition found in conventional PWR reactors \u2014 without the need for costly surface pressurization systems. The surrounding geology serves as passive containment. This cuts surface infrastructure costs and reduces construction complexity compared to a traditional plant. Deep Fission estimates a build time of approximately six months per reactor \u2014 a figure that, if confirmed, would radically change deployment timelines relative to current industry standards.<\/p>\n<p>On the financial side, the company completed its <strong>Nasdaq<\/strong> listing in mid-2026, raising $40 million in gross proceeds through an IPO priced at $16 per share. Those funds are financing engineering, research, licensing, and construction of the pilot reactor. The U.S. Department of Energy has already approved the system&#8217;s safety design. Deep Fission is participating in the DOE&#8217;s Reactor Pilot Program, which targets first criticality through an accelerated licensing pathway. Target customers include electric utilities, heavy industry, and data centers \u2014 markets demanding reliable, low-carbon baseload power.<\/p>\n<p>The October 20 call will likely serve as an opportunity to update the market on progress in large-diameter drilling and on the roadmap toward a full-scale demonstration. If the Kansas pilot program delivers the expected results, Deep Fission could become one of the few operators in the world with real-world data \u2014 not just simulations \u2014 on a nuclear reactor installed underground. That milestone would fundamentally reshape the possibilities for deploying nuclear energy in contexts that today are considered out of reach.<\/p>\n","protected":false},"excerpt":{"rendered":"<p>Deep Fission (Nasdaq: FISN) has scheduled a business update call for October 20, 2026, as its Gravity reactor \u2014 an SMR installed one mile underground \u2014 advances through the pilot phase in Kansas, with the first borehole drilled and a canister prototype already tested.<\/p>\n","protected":false},"author":25,"featured_media":3587,"comment_status":"open","ping_status":"open","sticky":false,"template":"","format":"standard","meta":{"_acf_changed":false,"footnotes":""},"categories":[],"tags":[],"class_list":["post-3590","post","type-post","status-publish","format-standard","has-post-thumbnail","hentry"],"acf":[],"yoast_head":"<!-- This site is optimized with the Yoast SEO plugin v28.4 - https:\/\/yoast.com\/product\/yoast-seo-wordpress\/ -->\n<title>Deep Fission to Brief Investors on October 20 About Underground Gravity Reactor - Energia nucleare<\/title>\n<meta name=\"description\" content=\"Deep Fission updates the market on October 20 on the Gravity reactor, a 15 MWe underground SMR now in the pilot phase in Parsons, Kansas.\" \/>\n<meta name=\"robots\" content=\"index, follow, max-snippet:-1, max-image-preview:large, max-video-preview:-1\" \/>\n<link rel=\"canonical\" href=\"https:\/\/energianucleare.eu\/en\/deep-fission-to-brief-investors-on-october-20-about-underground-gravity-reactor\/\" \/>\n<meta property=\"og:locale\" content=\"en_US\" \/>\n<meta property=\"og:type\" content=\"article\" \/>\n<meta property=\"og:title\" content=\"Deep Fission to Brief Investors on October 20 About Underground Gravity Reactor - Energia nucleare\" \/>\n<meta property=\"og:description\" content=\"Deep Fission updates the market on October 20 on the Gravity reactor, a 15 MWe underground SMR now in the pilot phase in Parsons, Kansas.\" \/>\n<meta property=\"og:url\" content=\"https:\/\/energianucleare.eu\/en\/deep-fission-to-brief-investors-on-october-20-about-underground-gravity-reactor\/\" \/>\n<meta property=\"og:site_name\" content=\"Energia nucleare\" \/>\n<meta property=\"article:published_time\" content=\"2026-10-01T18:19:49+00:00\" \/>\n<meta property=\"og:image\" content=\"https:\/\/energianucleare.eu\/wp-content\/uploads\/2026\/10\/publish_673aba3c3d1c49108407e31b5b3e3936.jpg\" \/>\n\t<meta property=\"og:image:width\" content=\"1536\" \/>\n\t<meta property=\"og:image:height\" content=\"1024\" \/>\n\t<meta property=\"og:image:type\" content=\"image\/jpeg\" \/>\n<meta name=\"author\" content=\"Redazione Energia Nucleare\" \/>\n<meta name=\"twitter:card\" content=\"summary_large_image\" \/>\n<meta name=\"twitter:label1\" content=\"Written by\" \/>\n\t<meta name=\"twitter:data1\" content=\"Redazione Energia Nucleare\" \/>\n\t<meta name=\"twitter:label2\" content=\"Est. reading time\" \/>\n\t<meta name=\"twitter:data2\" content=\"3 minutes\" \/>\n<script type=\"application\/ld+json\" class=\"yoast-schema-graph\">{\"@context\":\"https:\\\/\\\/schema.org\",\"@graph\":[{\"@type\":\"Article\",\"@id\":\"https:\\\/\\\/energianucleare.eu\\\/en\\\/deep-fission-to-brief-investors-on-october-20-about-underground-gravity-reactor\\\/#article\",\"isPartOf\":{\"@id\":\"https:\\\/\\\/energianucleare.eu\\\/en\\\/deep-fission-to-brief-investors-on-october-20-about-underground-gravity-reactor\\\/\"},\"author\":{\"name\":\"Redazione Energia Nucleare\",\"@id\":\"https:\\\/\\\/energianucleare.eu\\\/en\\\/#\\\/schema\\\/person\\\/2c3f466ad139658dfa60c575cf287fb7\"},\"headline\":\"Deep Fission to Brief Investors on October 20 About Underground Gravity Reactor\",\"datePublished\":\"2026-10-01T18:19:49+00:00\",\"mainEntityOfPage\":{\"@id\":\"https:\\\/\\\/energianucleare.eu\\\/en\\\/deep-fission-to-brief-investors-on-october-20-about-underground-gravity-reactor\\\/\"},\"wordCount\":514,\"commentCount\":0,\"image\":{\"@id\":\"https:\\\/\\\/energianucleare.eu\\\/en\\\/deep-fission-to-brief-investors-on-october-20-about-underground-gravity-reactor\\\/#primaryimage\"},\"thumbnailUrl\":\"https:\\\/\\\/energianucleare.eu\\\/wp-content\\\/uploads\\\/2026\\\/10\\\/publish_673aba3c3d1c49108407e31b5b3e3936.jpg\",\"inLanguage\":\"en-US\",\"potentialAction\":[{\"@type\":\"CommentAction\",\"name\":\"Comment\",\"target\":[\"https:\\\/\\\/energianucleare.eu\\\/en\\\/deep-fission-to-brief-investors-on-october-20-about-underground-gravity-reactor\\\/#respond\"]}]},{\"@type\":\"WebPage\",\"@id\":\"https:\\\/\\\/energianucleare.eu\\\/en\\\/deep-fission-to-brief-investors-on-october-20-about-underground-gravity-reactor\\\/\",\"url\":\"https:\\\/\\\/energianucleare.eu\\\/en\\\/deep-fission-to-brief-investors-on-october-20-about-underground-gravity-reactor\\\/\",\"name\":\"Deep Fission to Brief Investors on October 20 About Underground Gravity Reactor - Energia nucleare\",\"isPartOf\":{\"@id\":\"https:\\\/\\\/energianucleare.eu\\\/en\\\/#website\"},\"primaryImageOfPage\":{\"@id\":\"https:\\\/\\\/energianucleare.eu\\\/en\\\/deep-fission-to-brief-investors-on-october-20-about-underground-gravity-reactor\\\/#primaryimage\"},\"image\":{\"@id\":\"https:\\\/\\\/energianucleare.eu\\\/en\\\/deep-fission-to-brief-investors-on-october-20-about-underground-gravity-reactor\\\/#primaryimage\"},\"thumbnailUrl\":\"https:\\\/\\\/energianucleare.eu\\\/wp-content\\\/uploads\\\/2026\\\/10\\\/publish_673aba3c3d1c49108407e31b5b3e3936.jpg\",\"datePublished\":\"2026-10-01T18:19:49+00:00\",\"author\":{\"@id\":\"https:\\\/\\\/energianucleare.eu\\\/en\\\/#\\\/schema\\\/person\\\/2c3f466ad139658dfa60c575cf287fb7\"},\"description\":\"Deep Fission updates the market on October 20 on the Gravity reactor, a 15 MWe underground SMR now in the pilot phase in Parsons, Kansas.\",\"breadcrumb\":{\"@id\":\"https:\\\/\\\/energianucleare.eu\\\/en\\\/deep-fission-to-brief-investors-on-october-20-about-underground-gravity-reactor\\\/#breadcrumb\"},\"inLanguage\":\"en-US\",\"potentialAction\":[{\"@type\":\"ReadAction\",\"target\":[\"https:\\\/\\\/energianucleare.eu\\\/en\\\/deep-fission-to-brief-investors-on-october-20-about-underground-gravity-reactor\\\/\"]}]},{\"@type\":\"ImageObject\",\"inLanguage\":\"en-US\",\"@id\":\"https:\\\/\\\/energianucleare.eu\\\/en\\\/deep-fission-to-brief-investors-on-october-20-about-underground-gravity-reactor\\\/#primaryimage\",\"url\":\"https:\\\/\\\/energianucleare.eu\\\/wp-content\\\/uploads\\\/2026\\\/10\\\/publish_673aba3c3d1c49108407e31b5b3e3936.jpg\",\"contentUrl\":\"https:\\\/\\\/energianucleare.eu\\\/wp-content\\\/uploads\\\/2026\\\/10\\\/publish_673aba3c3d1c49108407e31b5b3e3936.jpg\",\"width\":1536,\"height\":1024},{\"@type\":\"BreadcrumbList\",\"@id\":\"https:\\\/\\\/energianucleare.eu\\\/en\\\/deep-fission-to-brief-investors-on-october-20-about-underground-gravity-reactor\\\/#breadcrumb\",\"itemListElement\":[{\"@type\":\"ListItem\",\"position\":1,\"name\":\"Home\",\"item\":\"https:\\\/\\\/energianucleare.eu\\\/en\\\/\"},{\"@type\":\"ListItem\",\"position\":2,\"name\":\"Deep Fission to Brief Investors on October 20 About Underground Gravity Reactor\"}]},{\"@type\":\"WebSite\",\"@id\":\"https:\\\/\\\/energianucleare.eu\\\/en\\\/#website\",\"url\":\"https:\\\/\\\/energianucleare.eu\\\/en\\\/\",\"name\":\"Energia nucleare\",\"description\":\"Notizie sul nucleare\",\"potentialAction\":[{\"@type\":\"SearchAction\",\"target\":{\"@type\":\"EntryPoint\",\"urlTemplate\":\"https:\\\/\\\/energianucleare.eu\\\/en\\\/?s={search_term_string}\"},\"query-input\":{\"@type\":\"PropertyValueSpecification\",\"valueRequired\":true,\"valueName\":\"search_term_string\"}}],\"inLanguage\":\"en-US\"},{\"@type\":\"Person\",\"@id\":\"https:\\\/\\\/energianucleare.eu\\\/en\\\/#\\\/schema\\\/person\\\/2c3f466ad139658dfa60c575cf287fb7\",\"name\":\"Redazione Energia Nucleare\",\"image\":{\"@type\":\"ImageObject\",\"inLanguage\":\"en-US\",\"@id\":\"https:\\\/\\\/secure.gravatar.com\\\/avatar\\\/f7573bf636adfceb968c63d469c0889af0a78eb4935f321c17f76df121e056a6?s=96&d=mm&r=g\",\"url\":\"https:\\\/\\\/secure.gravatar.com\\\/avatar\\\/f7573bf636adfceb968c63d469c0889af0a78eb4935f321c17f76df121e056a6?s=96&d=mm&r=g\",\"contentUrl\":\"https:\\\/\\\/secure.gravatar.com\\\/avatar\\\/f7573bf636adfceb968c63d469c0889af0a78eb4935f321c17f76df121e056a6?s=96&d=mm&r=g\",\"caption\":\"Redazione Energia Nucleare\"},\"url\":\"https:\\\/\\\/energianucleare.eu\\\/en\\\/author\\\/redazione\\\/\"}]}<\/script>\n<!-- \/ Yoast SEO plugin. -->","yoast_head_json":{"title":"Deep Fission to Brief Investors on October 20 About Underground Gravity Reactor - Energia nucleare","description":"Deep Fission updates the market on October 20 on the Gravity reactor, a 15 MWe underground SMR now in the pilot phase in Parsons, Kansas.","robots":{"index":"index","follow":"follow","max-snippet":"max-snippet:-1","max-image-preview":"max-image-preview:large","max-video-preview":"max-video-preview:-1"},"canonical":"https:\/\/energianucleare.eu\/en\/deep-fission-to-brief-investors-on-october-20-about-underground-gravity-reactor\/","og_locale":"en_US","og_type":"article","og_title":"Deep Fission to Brief Investors on October 20 About Underground Gravity Reactor - Energia nucleare","og_description":"Deep Fission updates the market on October 20 on the Gravity reactor, a 15 MWe underground SMR now in the pilot phase in Parsons, Kansas.","og_url":"https:\/\/energianucleare.eu\/en\/deep-fission-to-brief-investors-on-october-20-about-underground-gravity-reactor\/","og_site_name":"Energia nucleare","article_published_time":"2026-10-01T18:19:49+00:00","og_image":[{"width":1536,"height":1024,"url":"https:\/\/energianucleare.eu\/wp-content\/uploads\/2026\/10\/publish_673aba3c3d1c49108407e31b5b3e3936.jpg","type":"image\/jpeg"}],"author":"Redazione Energia Nucleare","twitter_card":"summary_large_image","twitter_misc":{"Written by":"Redazione Energia Nucleare","Est. reading time":"3 minutes"},"schema":{"@context":"https:\/\/schema.org","@graph":[{"@type":"Article","@id":"https:\/\/energianucleare.eu\/en\/deep-fission-to-brief-investors-on-october-20-about-underground-gravity-reactor\/#article","isPartOf":{"@id":"https:\/\/energianucleare.eu\/en\/deep-fission-to-brief-investors-on-october-20-about-underground-gravity-reactor\/"},"author":{"name":"Redazione Energia Nucleare","@id":"https:\/\/energianucleare.eu\/en\/#\/schema\/person\/2c3f466ad139658dfa60c575cf287fb7"},"headline":"Deep Fission to Brief Investors on October 20 About Underground Gravity Reactor","datePublished":"2026-10-01T18:19:49+00:00","mainEntityOfPage":{"@id":"https:\/\/energianucleare.eu\/en\/deep-fission-to-brief-investors-on-october-20-about-underground-gravity-reactor\/"},"wordCount":514,"commentCount":0,"image":{"@id":"https:\/\/energianucleare.eu\/en\/deep-fission-to-brief-investors-on-october-20-about-underground-gravity-reactor\/#primaryimage"},"thumbnailUrl":"https:\/\/energianucleare.eu\/wp-content\/uploads\/2026\/10\/publish_673aba3c3d1c49108407e31b5b3e3936.jpg","inLanguage":"en-US","potentialAction":[{"@type":"CommentAction","name":"Comment","target":["https:\/\/energianucleare.eu\/en\/deep-fission-to-brief-investors-on-october-20-about-underground-gravity-reactor\/#respond"]}]},{"@type":"WebPage","@id":"https:\/\/energianucleare.eu\/en\/deep-fission-to-brief-investors-on-october-20-about-underground-gravity-reactor\/","url":"https:\/\/energianucleare.eu\/en\/deep-fission-to-brief-investors-on-october-20-about-underground-gravity-reactor\/","name":"Deep Fission to Brief Investors on October 20 About Underground Gravity Reactor - Energia nucleare","isPartOf":{"@id":"https:\/\/energianucleare.eu\/en\/#website"},"primaryImageOfPage":{"@id":"https:\/\/energianucleare.eu\/en\/deep-fission-to-brief-investors-on-october-20-about-underground-gravity-reactor\/#primaryimage"},"image":{"@id":"https:\/\/energianucleare.eu\/en\/deep-fission-to-brief-investors-on-october-20-about-underground-gravity-reactor\/#primaryimage"},"thumbnailUrl":"https:\/\/energianucleare.eu\/wp-content\/uploads\/2026\/10\/publish_673aba3c3d1c49108407e31b5b3e3936.jpg","datePublished":"2026-10-01T18:19:49+00:00","author":{"@id":"https:\/\/energianucleare.eu\/en\/#\/schema\/person\/2c3f466ad139658dfa60c575cf287fb7"},"description":"Deep Fission updates the market on October 20 on the Gravity reactor, a 15 MWe underground SMR now in the pilot phase in Parsons, Kansas.","breadcrumb":{"@id":"https:\/\/energianucleare.eu\/en\/deep-fission-to-brief-investors-on-october-20-about-underground-gravity-reactor\/#breadcrumb"},"inLanguage":"en-US","potentialAction":[{"@type":"ReadAction","target":["https:\/\/energianucleare.eu\/en\/deep-fission-to-brief-investors-on-october-20-about-underground-gravity-reactor\/"]}]},{"@type":"ImageObject","inLanguage":"en-US","@id":"https:\/\/energianucleare.eu\/en\/deep-fission-to-brief-investors-on-october-20-about-underground-gravity-reactor\/#primaryimage","url":"https:\/\/energianucleare.eu\/wp-content\/uploads\/2026\/10\/publish_673aba3c3d1c49108407e31b5b3e3936.jpg","contentUrl":"https:\/\/energianucleare.eu\/wp-content\/uploads\/2026\/10\/publish_673aba3c3d1c49108407e31b5b3e3936.jpg","width":1536,"height":1024},{"@type":"BreadcrumbList","@id":"https:\/\/energianucleare.eu\/en\/deep-fission-to-brief-investors-on-october-20-about-underground-gravity-reactor\/#breadcrumb","itemListElement":[{"@type":"ListItem","position":1,"name":"Home","item":"https:\/\/energianucleare.eu\/en\/"},{"@type":"ListItem","position":2,"name":"Deep Fission to Brief Investors on October 20 About Underground Gravity Reactor"}]},{"@type":"WebSite","@id":"https:\/\/energianucleare.eu\/en\/#website","url":"https:\/\/energianucleare.eu\/en\/","name":"Energia nucleare","description":"Notizie sul nucleare","potentialAction":[{"@type":"SearchAction","target":{"@type":"EntryPoint","urlTemplate":"https:\/\/energianucleare.eu\/en\/?s={search_term_string}"},"query-input":{"@type":"PropertyValueSpecification","valueRequired":true,"valueName":"search_term_string"}}],"inLanguage":"en-US"},{"@type":"Person","@id":"https:\/\/energianucleare.eu\/en\/#\/schema\/person\/2c3f466ad139658dfa60c575cf287fb7","name":"Redazione Energia Nucleare","image":{"@type":"ImageObject","inLanguage":"en-US","@id":"https:\/\/secure.gravatar.com\/avatar\/f7573bf636adfceb968c63d469c0889af0a78eb4935f321c17f76df121e056a6?s=96&d=mm&r=g","url":"https:\/\/secure.gravatar.com\/avatar\/f7573bf636adfceb968c63d469c0889af0a78eb4935f321c17f76df121e056a6?s=96&d=mm&r=g","contentUrl":"https:\/\/secure.gravatar.com\/avatar\/f7573bf636adfceb968c63d469c0889af0a78eb4935f321c17f76df121e056a6?s=96&d=mm&r=g","caption":"Redazione Energia Nucleare"},"url":"https:\/\/energianucleare.eu\/en\/author\/redazione\/"}]}},"_links":{"self":[{"href":"https:\/\/energianucleare.eu\/en\/wp-json\/wp\/v2\/posts\/3590","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/energianucleare.eu\/en\/wp-json\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/energianucleare.eu\/en\/wp-json\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"https:\/\/energianucleare.eu\/en\/wp-json\/wp\/v2\/users\/25"}],"replies":[{"embeddable":true,"href":"https:\/\/energianucleare.eu\/en\/wp-json\/wp\/v2\/comments?post=3590"}],"version-history":[{"count":0,"href":"https:\/\/energianucleare.eu\/en\/wp-json\/wp\/v2\/posts\/3590\/revisions"}],"wp:featuredmedia":[{"embeddable":true,"href":"https:\/\/energianucleare.eu\/en\/wp-json\/wp\/v2\/media\/3587"}],"wp:attachment":[{"href":"https:\/\/energianucleare.eu\/en\/wp-json\/wp\/v2\/media?parent=3590"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/energianucleare.eu\/en\/wp-json\/wp\/v2\/categories?post=3590"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/energianucleare.eu\/en\/wp-json\/wp\/v2\/tags?post=3590"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}