{"id":3879,"date":"2026-10-13T20:13:57","date_gmt":"2026-10-13T18:13:57","guid":{"rendered":"https:\/\/energianucleare.eu\/taril-enters-nuclear-energy-first-order-for-transformers-at-kaiga-units-5-and-6\/"},"modified":"2026-10-13T20:13:57","modified_gmt":"2026-10-13T18:13:57","slug":"taril-enters-nuclear-energy-first-order-for-transformers-at-kaiga-units-5-and-6","status":"publish","type":"post","link":"https:\/\/energianucleare.eu\/en\/taril-enters-nuclear-energy-first-order-for-transformers-at-kaiga-units-5-and-6\/","title":{"rendered":"TARIL enters nuclear energy: first order for transformers at Kaiga Units 5 and 6"},"content":{"rendered":"<p><strong>Transformers and Rectifiers (India) Limited (TARIL)<\/strong> has landed its first order in the nuclear energy sector: the supply of generator transformers for the <strong>NPCIL Kaiga Units 5 and 6<\/strong> project in Karnataka. The order comes through <strong>Megha Engineering and Infrastructures Limited (MEIL)<\/strong>, the EPC contractor for the plant. For TARIL, this marks a genuine breakthrough \u2014 a company that started out as an industrial transformer manufacturer is now stepping into the most demanding segment of the power supply chain for the very first time.<\/p>\n<p>Kaiga Units 5 and 6 are two pressurised heavy water reactors rated at <strong>700 MWe each<\/strong>, designed entirely in India. Together, they will add <strong>1,400 MW<\/strong> of nuclear capacity to the Kaiga site, one of the longest-running plants in India&#8217;s nuclear fleet. The project is part of the national 700 MWe PHWR programme, which aims to scale up domestic nuclear generation using locally developed technologies and components. TARIL&#8217;s transformers will handle power evacuation from both reactors and their integration into the high-voltage transmission grid.<\/p>\n<p>The order, classified as &#8220;large,&#8221; is valued between 100 and 500 crore rupees, with an execution timeline of <strong>35 months<\/strong>. Nor is it a one-off win. During the same quarter, TARIL also received an order from <strong>Damodar Valley Corporation<\/strong> for 500 MVA and 200 MVA autotransformers, along with contracts from Gujarat Energy Transmission Corporation. The order book is strengthening across multiple fronts simultaneously, with the export component \u2014 primarily targeting the US and European markets \u2014 now representing a structural share of revenues.<\/p>\n<p>The financial results confirm the company&#8217;s positive momentum. In the second quarter of FY27, TARIL posted a <strong>consolidated net profit up 118% year-on-year<\/strong>, with gross revenues reaching approximately 2,395 crore rupees. The stock had already reacted sharply to the nuclear order announcement, surging nearly 8% in a single trading session. The combination of a growing order book and improving margins points to a clear upward trajectory in the quarters ahead.<\/p>\n<p>The broader context is equally significant. <strong>MEIL<\/strong> had secured the EPC contract for Kaiga 5 and 6 in April 2025, worth 12,800 crore rupees \u2014 the single largest order ever awarded by NPCIL. TARIL&#8217;s involvement adds another layer of indigenous manufacturing capability to a project that India considers central to achieving its energy targets by 2047. TARIL&#8217;s Managing Director Satyen Mamtora described the order as an entry into the high-value segment of the nuclear power supply chain, with long-term ambitions spanning the entire high-voltage transmission infrastructure linked to the country&#8217;s atomic plants.<\/p>\n<p>If TARIL delivers this contract on time and to the exacting standards required by the nuclear industry \u2014 which demands far tighter tolerances and certifications than conventional markets \u2014 this first order could open up a sustainable line of business. India has ambitious plans to significantly expand its nuclear capacity over the coming decades, and every new plant will need high-reliability electrical components. Being already embedded in the NPCIL supply chain, at this stage, is worth far more than the contract itself.<\/p>\n","protected":false},"excerpt":{"rendered":"<p>Transformers and Rectifiers (India) has secured its first-ever order in the nuclear energy sector, supplying generator transformers for NPCIL&#8217;s Kaiga Units 5 and 6 in Karnataka. The company closes Q2 FY27 with net profit up 118% year-on-year.<\/p>\n","protected":false},"author":25,"featured_media":3876,"comment_status":"open","ping_status":"open","sticky":false,"template":"","format":"standard","meta":{"_acf_changed":false,"footnotes":""},"categories":[],"tags":[],"class_list":["post-3879","post","type-post","status-publish","format-standard","has-post-thumbnail","hentry"],"acf":[],"yoast_head":"<!-- This site is optimized with the Yoast SEO plugin v28.7 - https:\/\/yoast.com\/product\/yoast-seo-wordpress\/ -->\n<title>TARIL enters nuclear energy: first order for transformers at Kaiga Units 5 and 6 - Energia nucleare<\/title>\n<meta name=\"description\" content=\"TARIL wins first nuclear order for generator transformers at NPCIL Kaiga Units 5 &amp; 6 (1,400 MW) in Karnataka. Net profit up 118% in Q2 FY27.\" \/>\n<meta name=\"robots\" content=\"index, follow, max-snippet:-1, max-image-preview:large, max-video-preview:-1\" \/>\n<link rel=\"canonical\" href=\"https:\/\/energianucleare.eu\/en\/taril-enters-nuclear-energy-first-order-for-transformers-at-kaiga-units-5-and-6\/\" \/>\n<meta property=\"og:locale\" content=\"en_US\" \/>\n<meta property=\"og:type\" content=\"article\" \/>\n<meta property=\"og:title\" content=\"TARIL enters nuclear energy: first order for transformers at Kaiga Units 5 and 6 - Energia nucleare\" \/>\n<meta property=\"og:description\" content=\"TARIL wins first nuclear order for generator transformers at NPCIL Kaiga Units 5 &amp; 6 (1,400 MW) in Karnataka. Net profit up 118% in Q2 FY27.\" \/>\n<meta property=\"og:url\" content=\"https:\/\/energianucleare.eu\/en\/taril-enters-nuclear-energy-first-order-for-transformers-at-kaiga-units-5-and-6\/\" \/>\n<meta property=\"og:site_name\" content=\"Energia nucleare\" \/>\n<meta property=\"article:published_time\" content=\"2026-10-13T18:13:57+00:00\" \/>\n<meta property=\"og:image\" content=\"https:\/\/energianucleare.eu\/wp-content\/uploads\/2026\/10\/publish_edc825dfaded470b80fb230b43985be7.jpg\" \/>\n\t<meta property=\"og:image:width\" content=\"1536\" \/>\n\t<meta property=\"og:image:height\" content=\"1024\" \/>\n\t<meta property=\"og:image:type\" content=\"image\/jpeg\" \/>\n<meta name=\"author\" content=\"Redazione Energia Nucleare\" \/>\n<meta name=\"twitter:card\" content=\"summary_large_image\" \/>\n<meta name=\"twitter:label1\" content=\"Written by\" \/>\n\t<meta name=\"twitter:data1\" content=\"Redazione Energia Nucleare\" \/>\n\t<meta name=\"twitter:label2\" content=\"Est. reading time\" \/>\n\t<meta name=\"twitter:data2\" content=\"2 minutes\" \/>\n<script type=\"application\/ld+json\" class=\"yoast-schema-graph\">{\"@context\":\"https:\\\/\\\/schema.org\",\"@graph\":[{\"@type\":\"Article\",\"@id\":\"https:\\\/\\\/energianucleare.eu\\\/en\\\/taril-enters-nuclear-energy-first-order-for-transformers-at-kaiga-units-5-and-6\\\/#article\",\"isPartOf\":{\"@id\":\"https:\\\/\\\/energianucleare.eu\\\/en\\\/taril-enters-nuclear-energy-first-order-for-transformers-at-kaiga-units-5-and-6\\\/\"},\"author\":{\"name\":\"Redazione Energia Nucleare\",\"@id\":\"https:\\\/\\\/energianucleare.eu\\\/en\\\/#\\\/schema\\\/person\\\/2c3f466ad139658dfa60c575cf287fb7\"},\"headline\":\"TARIL enters nuclear energy: first order for transformers at Kaiga Units 5 and 6\",\"datePublished\":\"2026-10-13T18:13:57+00:00\",\"mainEntityOfPage\":{\"@id\":\"https:\\\/\\\/energianucleare.eu\\\/en\\\/taril-enters-nuclear-energy-first-order-for-transformers-at-kaiga-units-5-and-6\\\/\"},\"wordCount\":487,\"commentCount\":0,\"image\":{\"@id\":\"https:\\\/\\\/energianucleare.eu\\\/en\\\/taril-enters-nuclear-energy-first-order-for-transformers-at-kaiga-units-5-and-6\\\/#primaryimage\"},\"thumbnailUrl\":\"https:\\\/\\\/energianucleare.eu\\\/wp-content\\\/uploads\\\/2026\\\/10\\\/publish_edc825dfaded470b80fb230b43985be7.jpg\",\"inLanguage\":\"en-US\",\"potentialAction\":[{\"@type\":\"CommentAction\",\"name\":\"Comment\",\"target\":[\"https:\\\/\\\/energianucleare.eu\\\/en\\\/taril-enters-nuclear-energy-first-order-for-transformers-at-kaiga-units-5-and-6\\\/#respond\"]}]},{\"@type\":\"WebPage\",\"@id\":\"https:\\\/\\\/energianucleare.eu\\\/en\\\/taril-enters-nuclear-energy-first-order-for-transformers-at-kaiga-units-5-and-6\\\/\",\"url\":\"https:\\\/\\\/energianucleare.eu\\\/en\\\/taril-enters-nuclear-energy-first-order-for-transformers-at-kaiga-units-5-and-6\\\/\",\"name\":\"TARIL enters nuclear energy: first order for transformers at Kaiga Units 5 and 6 - Energia nucleare\",\"isPartOf\":{\"@id\":\"https:\\\/\\\/energianucleare.eu\\\/en\\\/#website\"},\"primaryImageOfPage\":{\"@id\":\"https:\\\/\\\/energianucleare.eu\\\/en\\\/taril-enters-nuclear-energy-first-order-for-transformers-at-kaiga-units-5-and-6\\\/#primaryimage\"},\"image\":{\"@id\":\"https:\\\/\\\/energianucleare.eu\\\/en\\\/taril-enters-nuclear-energy-first-order-for-transformers-at-kaiga-units-5-and-6\\\/#primaryimage\"},\"thumbnailUrl\":\"https:\\\/\\\/energianucleare.eu\\\/wp-content\\\/uploads\\\/2026\\\/10\\\/publish_edc825dfaded470b80fb230b43985be7.jpg\",\"datePublished\":\"2026-10-13T18:13:57+00:00\",\"author\":{\"@id\":\"https:\\\/\\\/energianucleare.eu\\\/en\\\/#\\\/schema\\\/person\\\/2c3f466ad139658dfa60c575cf287fb7\"},\"description\":\"TARIL wins first nuclear order for generator transformers at NPCIL Kaiga Units 5 & 6 (1,400 MW) in Karnataka. Net profit up 118% in Q2 FY27.\",\"breadcrumb\":{\"@id\":\"https:\\\/\\\/energianucleare.eu\\\/en\\\/taril-enters-nuclear-energy-first-order-for-transformers-at-kaiga-units-5-and-6\\\/#breadcrumb\"},\"inLanguage\":\"en-US\",\"potentialAction\":[{\"@type\":\"ReadAction\",\"target\":[\"https:\\\/\\\/energianucleare.eu\\\/en\\\/taril-enters-nuclear-energy-first-order-for-transformers-at-kaiga-units-5-and-6\\\/\"]}]},{\"@type\":\"ImageObject\",\"inLanguage\":\"en-US\",\"@id\":\"https:\\\/\\\/energianucleare.eu\\\/en\\\/taril-enters-nuclear-energy-first-order-for-transformers-at-kaiga-units-5-and-6\\\/#primaryimage\",\"url\":\"https:\\\/\\\/energianucleare.eu\\\/wp-content\\\/uploads\\\/2026\\\/10\\\/publish_edc825dfaded470b80fb230b43985be7.jpg\",\"contentUrl\":\"https:\\\/\\\/energianucleare.eu\\\/wp-content\\\/uploads\\\/2026\\\/10\\\/publish_edc825dfaded470b80fb230b43985be7.jpg\",\"width\":1536,\"height\":1024},{\"@type\":\"BreadcrumbList\",\"@id\":\"https:\\\/\\\/energianucleare.eu\\\/en\\\/taril-enters-nuclear-energy-first-order-for-transformers-at-kaiga-units-5-and-6\\\/#breadcrumb\",\"itemListElement\":[{\"@type\":\"ListItem\",\"position\":1,\"name\":\"Home\",\"item\":\"https:\\\/\\\/energianucleare.eu\\\/en\\\/\"},{\"@type\":\"ListItem\",\"position\":2,\"name\":\"TARIL enters nuclear energy: first order for transformers at Kaiga Units 5 and 6\"}]},{\"@type\":\"WebSite\",\"@id\":\"https:\\\/\\\/energianucleare.eu\\\/en\\\/#website\",\"url\":\"https:\\\/\\\/energianucleare.eu\\\/en\\\/\",\"name\":\"Energia nucleare\",\"description\":\"Notizie sul nucleare\",\"potentialAction\":[{\"@type\":\"SearchAction\",\"target\":{\"@type\":\"EntryPoint\",\"urlTemplate\":\"https:\\\/\\\/energianucleare.eu\\\/en\\\/?s={search_term_string}\"},\"query-input\":{\"@type\":\"PropertyValueSpecification\",\"valueRequired\":true,\"valueName\":\"search_term_string\"}}],\"inLanguage\":\"en-US\"},{\"@type\":\"Person\",\"@id\":\"https:\\\/\\\/energianucleare.eu\\\/en\\\/#\\\/schema\\\/person\\\/2c3f466ad139658dfa60c575cf287fb7\",\"name\":\"Redazione Energia Nucleare\",\"image\":{\"@type\":\"ImageObject\",\"inLanguage\":\"en-US\",\"@id\":\"https:\\\/\\\/secure.gravatar.com\\\/avatar\\\/f7573bf636adfceb968c63d469c0889af0a78eb4935f321c17f76df121e056a6?s=96&d=mm&r=g\",\"url\":\"https:\\\/\\\/secure.gravatar.com\\\/avatar\\\/f7573bf636adfceb968c63d469c0889af0a78eb4935f321c17f76df121e056a6?s=96&d=mm&r=g\",\"contentUrl\":\"https:\\\/\\\/secure.gravatar.com\\\/avatar\\\/f7573bf636adfceb968c63d469c0889af0a78eb4935f321c17f76df121e056a6?s=96&d=mm&r=g\",\"caption\":\"Redazione Energia Nucleare\"},\"url\":\"https:\\\/\\\/energianucleare.eu\\\/en\\\/author\\\/redazione\\\/\"}]}<\/script>\n<!-- \/ Yoast SEO plugin. -->","yoast_head_json":{"title":"TARIL enters nuclear energy: first order for transformers at Kaiga Units 5 and 6 - Energia nucleare","description":"TARIL wins first nuclear order for generator transformers at NPCIL Kaiga Units 5 & 6 (1,400 MW) in Karnataka. Net profit up 118% in Q2 FY27.","robots":{"index":"index","follow":"follow","max-snippet":"max-snippet:-1","max-image-preview":"max-image-preview:large","max-video-preview":"max-video-preview:-1"},"canonical":"https:\/\/energianucleare.eu\/en\/taril-enters-nuclear-energy-first-order-for-transformers-at-kaiga-units-5-and-6\/","og_locale":"en_US","og_type":"article","og_title":"TARIL enters nuclear energy: first order for transformers at Kaiga Units 5 and 6 - Energia nucleare","og_description":"TARIL wins first nuclear order for generator transformers at NPCIL Kaiga Units 5 & 6 (1,400 MW) in Karnataka. Net profit up 118% in Q2 FY27.","og_url":"https:\/\/energianucleare.eu\/en\/taril-enters-nuclear-energy-first-order-for-transformers-at-kaiga-units-5-and-6\/","og_site_name":"Energia nucleare","article_published_time":"2026-10-13T18:13:57+00:00","og_image":[{"width":1536,"height":1024,"url":"https:\/\/energianucleare.eu\/wp-content\/uploads\/2026\/10\/publish_edc825dfaded470b80fb230b43985be7.jpg","type":"image\/jpeg"}],"author":"Redazione Energia Nucleare","twitter_card":"summary_large_image","twitter_misc":{"Written by":"Redazione Energia Nucleare","Est. reading time":"2 minutes"},"schema":{"@context":"https:\/\/schema.org","@graph":[{"@type":"Article","@id":"https:\/\/energianucleare.eu\/en\/taril-enters-nuclear-energy-first-order-for-transformers-at-kaiga-units-5-and-6\/#article","isPartOf":{"@id":"https:\/\/energianucleare.eu\/en\/taril-enters-nuclear-energy-first-order-for-transformers-at-kaiga-units-5-and-6\/"},"author":{"name":"Redazione Energia Nucleare","@id":"https:\/\/energianucleare.eu\/en\/#\/schema\/person\/2c3f466ad139658dfa60c575cf287fb7"},"headline":"TARIL enters nuclear energy: first order for transformers at Kaiga Units 5 and 6","datePublished":"2026-10-13T18:13:57+00:00","mainEntityOfPage":{"@id":"https:\/\/energianucleare.eu\/en\/taril-enters-nuclear-energy-first-order-for-transformers-at-kaiga-units-5-and-6\/"},"wordCount":487,"commentCount":0,"image":{"@id":"https:\/\/energianucleare.eu\/en\/taril-enters-nuclear-energy-first-order-for-transformers-at-kaiga-units-5-and-6\/#primaryimage"},"thumbnailUrl":"https:\/\/energianucleare.eu\/wp-content\/uploads\/2026\/10\/publish_edc825dfaded470b80fb230b43985be7.jpg","inLanguage":"en-US","potentialAction":[{"@type":"CommentAction","name":"Comment","target":["https:\/\/energianucleare.eu\/en\/taril-enters-nuclear-energy-first-order-for-transformers-at-kaiga-units-5-and-6\/#respond"]}]},{"@type":"WebPage","@id":"https:\/\/energianucleare.eu\/en\/taril-enters-nuclear-energy-first-order-for-transformers-at-kaiga-units-5-and-6\/","url":"https:\/\/energianucleare.eu\/en\/taril-enters-nuclear-energy-first-order-for-transformers-at-kaiga-units-5-and-6\/","name":"TARIL enters nuclear energy: first order for transformers at Kaiga Units 5 and 6 - Energia nucleare","isPartOf":{"@id":"https:\/\/energianucleare.eu\/en\/#website"},"primaryImageOfPage":{"@id":"https:\/\/energianucleare.eu\/en\/taril-enters-nuclear-energy-first-order-for-transformers-at-kaiga-units-5-and-6\/#primaryimage"},"image":{"@id":"https:\/\/energianucleare.eu\/en\/taril-enters-nuclear-energy-first-order-for-transformers-at-kaiga-units-5-and-6\/#primaryimage"},"thumbnailUrl":"https:\/\/energianucleare.eu\/wp-content\/uploads\/2026\/10\/publish_edc825dfaded470b80fb230b43985be7.jpg","datePublished":"2026-10-13T18:13:57+00:00","author":{"@id":"https:\/\/energianucleare.eu\/en\/#\/schema\/person\/2c3f466ad139658dfa60c575cf287fb7"},"description":"TARIL wins first nuclear order for generator transformers at NPCIL Kaiga Units 5 & 6 (1,400 MW) in Karnataka. Net profit up 118% in Q2 FY27.","breadcrumb":{"@id":"https:\/\/energianucleare.eu\/en\/taril-enters-nuclear-energy-first-order-for-transformers-at-kaiga-units-5-and-6\/#breadcrumb"},"inLanguage":"en-US","potentialAction":[{"@type":"ReadAction","target":["https:\/\/energianucleare.eu\/en\/taril-enters-nuclear-energy-first-order-for-transformers-at-kaiga-units-5-and-6\/"]}]},{"@type":"ImageObject","inLanguage":"en-US","@id":"https:\/\/energianucleare.eu\/en\/taril-enters-nuclear-energy-first-order-for-transformers-at-kaiga-units-5-and-6\/#primaryimage","url":"https:\/\/energianucleare.eu\/wp-content\/uploads\/2026\/10\/publish_edc825dfaded470b80fb230b43985be7.jpg","contentUrl":"https:\/\/energianucleare.eu\/wp-content\/uploads\/2026\/10\/publish_edc825dfaded470b80fb230b43985be7.jpg","width":1536,"height":1024},{"@type":"BreadcrumbList","@id":"https:\/\/energianucleare.eu\/en\/taril-enters-nuclear-energy-first-order-for-transformers-at-kaiga-units-5-and-6\/#breadcrumb","itemListElement":[{"@type":"ListItem","position":1,"name":"Home","item":"https:\/\/energianucleare.eu\/en\/"},{"@type":"ListItem","position":2,"name":"TARIL enters nuclear energy: first order for transformers at Kaiga Units 5 and 6"}]},{"@type":"WebSite","@id":"https:\/\/energianucleare.eu\/en\/#website","url":"https:\/\/energianucleare.eu\/en\/","name":"Energia nucleare","description":"Notizie sul nucleare","potentialAction":[{"@type":"SearchAction","target":{"@type":"EntryPoint","urlTemplate":"https:\/\/energianucleare.eu\/en\/?s={search_term_string}"},"query-input":{"@type":"PropertyValueSpecification","valueRequired":true,"valueName":"search_term_string"}}],"inLanguage":"en-US"},{"@type":"Person","@id":"https:\/\/energianucleare.eu\/en\/#\/schema\/person\/2c3f466ad139658dfa60c575cf287fb7","name":"Redazione Energia Nucleare","image":{"@type":"ImageObject","inLanguage":"en-US","@id":"https:\/\/secure.gravatar.com\/avatar\/f7573bf636adfceb968c63d469c0889af0a78eb4935f321c17f76df121e056a6?s=96&d=mm&r=g","url":"https:\/\/secure.gravatar.com\/avatar\/f7573bf636adfceb968c63d469c0889af0a78eb4935f321c17f76df121e056a6?s=96&d=mm&r=g","contentUrl":"https:\/\/secure.gravatar.com\/avatar\/f7573bf636adfceb968c63d469c0889af0a78eb4935f321c17f76df121e056a6?s=96&d=mm&r=g","caption":"Redazione Energia Nucleare"},"url":"https:\/\/energianucleare.eu\/en\/author\/redazione\/"}]}},"_links":{"self":[{"href":"https:\/\/energianucleare.eu\/en\/wp-json\/wp\/v2\/posts\/3879","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/energianucleare.eu\/en\/wp-json\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/energianucleare.eu\/en\/wp-json\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"https:\/\/energianucleare.eu\/en\/wp-json\/wp\/v2\/users\/25"}],"replies":[{"embeddable":true,"href":"https:\/\/energianucleare.eu\/en\/wp-json\/wp\/v2\/comments?post=3879"}],"version-history":[{"count":0,"href":"https:\/\/energianucleare.eu\/en\/wp-json\/wp\/v2\/posts\/3879\/revisions"}],"wp:featuredmedia":[{"embeddable":true,"href":"https:\/\/energianucleare.eu\/en\/wp-json\/wp\/v2\/media\/3876"}],"wp:attachment":[{"href":"https:\/\/energianucleare.eu\/en\/wp-json\/wp\/v2\/media?parent=3879"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/energianucleare.eu\/en\/wp-json\/wp\/v2\/categories?post=3879"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/energianucleare.eu\/en\/wp-json\/wp\/v2\/tags?post=3879"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}