{"id":4142,"date":"2026-10-24T08:28:42","date_gmt":"2026-10-24T06:28:42","guid":{"rendered":"https:\/\/energianucleare.eu\/orlen-and-synthos-sign-bwrx-300-smr-agreement-for-wloclawek-and-stawy-monowskie\/"},"modified":"2026-10-24T08:28:42","modified_gmt":"2026-10-24T06:28:42","slug":"orlen-and-synthos-sign-bwrx-300-smr-agreement-for-wloclawek-and-stawy-monowskie","status":"publish","type":"post","link":"https:\/\/energianucleare.eu\/en\/orlen-and-synthos-sign-bwrx-300-smr-agreement-for-wloclawek-and-stawy-monowskie\/","title":{"rendered":"Orlen and Synthos Sign BWRX-300 SMR Agreement for W\u0142oc\u0142awek and Stawy Monowskie"},"content":{"rendered":"<p><strong>Orlen<\/strong>, <strong>Synthos Green Energy<\/strong> (SGE) and their joint venture Orlen Synthos Green Energy (OSGE) have signed a framework agreement for the development of <strong>BWRX-300<\/strong> small modular reactors in Poland. The deal covers the first two sites: W\u0142oc\u0142awek and Stawy Monowskie, near O\u015bwi\u0119cim. The parties disclosed the terms on 22 October, after three years of negotiations.<\/p>\n<p>At W\u0142oc\u0142awek, Orlen will act as lead investor and will obtain direct licensing rights to the technology. The plant will be built in stages through the special-purpose company BWRX-300 W\u0142oc\u0142awek, controlled by the oil and gas group. According to Polish press reports, Orlen&#8217;s stake will be 70% and Synthos&#8217;s 30%, with operational control resting with Orlen. The same structure applies to Stawy Monowskie, where SGE takes the lead role instead. The first unit at W\u0142oc\u0142awek is planned for the mid-2030s.<\/p>\n<p>Schedule, budget and scope of work will be set for each phase. Funding for later phases will depend on meeting the objectives of earlier ones. The details will be laid out in the implementing contracts, which the companies aim to finalize by the end of the year.<\/p>\n<p>The context explains the significance of the agreement. OSGE holds decisions-in-principle from the Ministry of Climate and Environment for <strong>24 reactors across six locations<\/strong>: W\u0142oc\u0142awek, Stawy Monowskie, Ostro\u0142\u0119ka, D\u0105browa G\u00f3rnicza, Krak\u00f3w (Nowa Huta) and Tarnobrzeg-Stalowa Wola. Until now, however, the allocation of roles and shares between the two partners had held back concrete progress on the projects. The technology is the 300 MWe boiling water reactor developed by GE Vernova-Hitachi.<\/p>\n<p>Orlen has included SMRs in its strategy: at least two units totaling 0.6 GWe by 2035. The W\u0142oc\u0142awek site is the one identified as a priority, located within an industrial area of the group that can directly absorb the energy produced. On the international front, SGE is moving in parallel: its subsidiary SGE SMR UK has signed a letter of intent with Origin Nuclear, a company of Ontario Power Generation, for a joint venture to manage the small modular reactors planned in the United Kingdom.<\/p>\n<p>With the division of responsibilities now settled, the next step is the implementing contracts expected by December. If they arrive on schedule, Poland can move from decisions-in-principle to preparing the first two construction sites, with W\u0142oc\u0142awek in the lead. For the rest of the 24-unit fleet, the same governance schemes could serve as a model for Ostro\u0142\u0119ka and the other four sites.<\/p>\n","protected":false},"excerpt":{"rendered":"<p>Orlen, Synthos Green Energy and their joint venture OSGE have signed a framework agreement for BWRX-300 small modular reactors at Poland&#8217;s first two sites. Orlen will lead W\u0142oc\u0142awek with a stake of about 70%, Synthos will lead Stawy Monowskie, and the first unit is expected in the mid-2030s.<\/p>\n","protected":false},"author":25,"featured_media":4139,"comment_status":"open","ping_status":"open","sticky":false,"template":"","format":"standard","meta":{"_acf_changed":false,"footnotes":""},"categories":[],"tags":[],"class_list":["post-4142","post","type-post","status-publish","format-standard","has-post-thumbnail","hentry"],"acf":[],"yoast_head":"<!-- This site is optimized with the Yoast SEO plugin v28.7 - https:\/\/yoast.com\/product\/yoast-seo-wordpress\/ -->\n<title>Orlen and Synthos Sign BWRX-300 SMR Agreement for W\u0142oc\u0142awek and Stawy Monowskie - Energia nucleare<\/title>\n<meta name=\"description\" content=\"Orlen and Synthos Green Energy sign the BWRX-300 SMR deal: Orlen leads W\u0142oc\u0142awek, Synthos leads Stawy Monowskie.\" \/>\n<meta name=\"robots\" content=\"index, follow, max-snippet:-1, max-image-preview:large, max-video-preview:-1\" \/>\n<link rel=\"canonical\" href=\"https:\/\/energianucleare.eu\/en\/orlen-and-synthos-sign-bwrx-300-smr-agreement-for-wloclawek-and-stawy-monowskie\/\" \/>\n<meta property=\"og:locale\" content=\"en_US\" \/>\n<meta property=\"og:type\" content=\"article\" \/>\n<meta property=\"og:title\" content=\"Orlen and Synthos Sign BWRX-300 SMR Agreement for W\u0142oc\u0142awek and Stawy Monowskie - Energia nucleare\" \/>\n<meta property=\"og:description\" content=\"Orlen and Synthos Green Energy sign the BWRX-300 SMR deal: Orlen leads W\u0142oc\u0142awek, Synthos leads Stawy Monowskie.\" \/>\n<meta property=\"og:url\" content=\"https:\/\/energianucleare.eu\/en\/orlen-and-synthos-sign-bwrx-300-smr-agreement-for-wloclawek-and-stawy-monowskie\/\" \/>\n<meta property=\"og:site_name\" content=\"Energia nucleare\" \/>\n<meta property=\"article:published_time\" content=\"2026-10-24T06:28:42+00:00\" \/>\n<meta property=\"og:image\" content=\"https:\/\/energianucleare.eu\/wp-content\/uploads\/2026\/10\/publish_c0303cbf7e6f4d07b5dac8183e484683.jpg\" \/>\n\t<meta property=\"og:image:width\" content=\"1536\" \/>\n\t<meta property=\"og:image:height\" content=\"1024\" \/>\n\t<meta property=\"og:image:type\" content=\"image\/jpeg\" \/>\n<meta name=\"author\" content=\"Redazione Energia Nucleare\" \/>\n<meta name=\"twitter:card\" content=\"summary_large_image\" \/>\n<meta name=\"twitter:label1\" content=\"Written by\" \/>\n\t<meta name=\"twitter:data1\" content=\"Redazione Energia Nucleare\" \/>\n\t<meta name=\"twitter:label2\" content=\"Est. reading time\" \/>\n\t<meta name=\"twitter:data2\" content=\"2 minutes\" \/>\n<script type=\"application\/ld+json\" class=\"yoast-schema-graph\">{\"@context\":\"https:\\\/\\\/schema.org\",\"@graph\":[{\"@type\":\"Article\",\"@id\":\"https:\\\/\\\/energianucleare.eu\\\/en\\\/orlen-and-synthos-sign-bwrx-300-smr-agreement-for-wloclawek-and-stawy-monowskie\\\/#article\",\"isPartOf\":{\"@id\":\"https:\\\/\\\/energianucleare.eu\\\/en\\\/orlen-and-synthos-sign-bwrx-300-smr-agreement-for-wloclawek-and-stawy-monowskie\\\/\"},\"author\":{\"name\":\"Redazione Energia Nucleare\",\"@id\":\"https:\\\/\\\/energianucleare.eu\\\/en\\\/#\\\/schema\\\/person\\\/2c3f466ad139658dfa60c575cf287fb7\"},\"headline\":\"Orlen and Synthos Sign BWRX-300 SMR Agreement for W\u0142oc\u0142awek and Stawy Monowskie\",\"datePublished\":\"2026-10-24T06:28:42+00:00\",\"mainEntityOfPage\":{\"@id\":\"https:\\\/\\\/energianucleare.eu\\\/en\\\/orlen-and-synthos-sign-bwrx-300-smr-agreement-for-wloclawek-and-stawy-monowskie\\\/\"},\"wordCount\":430,\"commentCount\":0,\"image\":{\"@id\":\"https:\\\/\\\/energianucleare.eu\\\/en\\\/orlen-and-synthos-sign-bwrx-300-smr-agreement-for-wloclawek-and-stawy-monowskie\\\/#primaryimage\"},\"thumbnailUrl\":\"https:\\\/\\\/energianucleare.eu\\\/wp-content\\\/uploads\\\/2026\\\/10\\\/publish_c0303cbf7e6f4d07b5dac8183e484683.jpg\",\"inLanguage\":\"en-US\",\"potentialAction\":[{\"@type\":\"CommentAction\",\"name\":\"Comment\",\"target\":[\"https:\\\/\\\/energianucleare.eu\\\/en\\\/orlen-and-synthos-sign-bwrx-300-smr-agreement-for-wloclawek-and-stawy-monowskie\\\/#respond\"]}]},{\"@type\":\"WebPage\",\"@id\":\"https:\\\/\\\/energianucleare.eu\\\/en\\\/orlen-and-synthos-sign-bwrx-300-smr-agreement-for-wloclawek-and-stawy-monowskie\\\/\",\"url\":\"https:\\\/\\\/energianucleare.eu\\\/en\\\/orlen-and-synthos-sign-bwrx-300-smr-agreement-for-wloclawek-and-stawy-monowskie\\\/\",\"name\":\"Orlen and Synthos Sign BWRX-300 SMR Agreement for W\u0142oc\u0142awek and Stawy Monowskie - Energia nucleare\",\"isPartOf\":{\"@id\":\"https:\\\/\\\/energianucleare.eu\\\/en\\\/#website\"},\"primaryImageOfPage\":{\"@id\":\"https:\\\/\\\/energianucleare.eu\\\/en\\\/orlen-and-synthos-sign-bwrx-300-smr-agreement-for-wloclawek-and-stawy-monowskie\\\/#primaryimage\"},\"image\":{\"@id\":\"https:\\\/\\\/energianucleare.eu\\\/en\\\/orlen-and-synthos-sign-bwrx-300-smr-agreement-for-wloclawek-and-stawy-monowskie\\\/#primaryimage\"},\"thumbnailUrl\":\"https:\\\/\\\/energianucleare.eu\\\/wp-content\\\/uploads\\\/2026\\\/10\\\/publish_c0303cbf7e6f4d07b5dac8183e484683.jpg\",\"datePublished\":\"2026-10-24T06:28:42+00:00\",\"author\":{\"@id\":\"https:\\\/\\\/energianucleare.eu\\\/en\\\/#\\\/schema\\\/person\\\/2c3f466ad139658dfa60c575cf287fb7\"},\"description\":\"Orlen and Synthos Green Energy sign the BWRX-300 SMR deal: Orlen leads W\u0142oc\u0142awek, Synthos leads Stawy Monowskie.\",\"breadcrumb\":{\"@id\":\"https:\\\/\\\/energianucleare.eu\\\/en\\\/orlen-and-synthos-sign-bwrx-300-smr-agreement-for-wloclawek-and-stawy-monowskie\\\/#breadcrumb\"},\"inLanguage\":\"en-US\",\"potentialAction\":[{\"@type\":\"ReadAction\",\"target\":[\"https:\\\/\\\/energianucleare.eu\\\/en\\\/orlen-and-synthos-sign-bwrx-300-smr-agreement-for-wloclawek-and-stawy-monowskie\\\/\"]}]},{\"@type\":\"ImageObject\",\"inLanguage\":\"en-US\",\"@id\":\"https:\\\/\\\/energianucleare.eu\\\/en\\\/orlen-and-synthos-sign-bwrx-300-smr-agreement-for-wloclawek-and-stawy-monowskie\\\/#primaryimage\",\"url\":\"https:\\\/\\\/energianucleare.eu\\\/wp-content\\\/uploads\\\/2026\\\/10\\\/publish_c0303cbf7e6f4d07b5dac8183e484683.jpg\",\"contentUrl\":\"https:\\\/\\\/energianucleare.eu\\\/wp-content\\\/uploads\\\/2026\\\/10\\\/publish_c0303cbf7e6f4d07b5dac8183e484683.jpg\",\"width\":1536,\"height\":1024,\"caption\":\"Illustrazione: Orlen e Synthos firmano l'intesa sugli SMR BWRX-300 a W\u0142oc\u0142awek e Stawy Monowskie\"},{\"@type\":\"BreadcrumbList\",\"@id\":\"https:\\\/\\\/energianucleare.eu\\\/en\\\/orlen-and-synthos-sign-bwrx-300-smr-agreement-for-wloclawek-and-stawy-monowskie\\\/#breadcrumb\",\"itemListElement\":[{\"@type\":\"ListItem\",\"position\":1,\"name\":\"Home\",\"item\":\"https:\\\/\\\/energianucleare.eu\\\/en\\\/\"},{\"@type\":\"ListItem\",\"position\":2,\"name\":\"Orlen and Synthos Sign BWRX-300 SMR Agreement for W\u0142oc\u0142awek and Stawy Monowskie\"}]},{\"@type\":\"WebSite\",\"@id\":\"https:\\\/\\\/energianucleare.eu\\\/en\\\/#website\",\"url\":\"https:\\\/\\\/energianucleare.eu\\\/en\\\/\",\"name\":\"Energia nucleare\",\"description\":\"Notizie sul nucleare\",\"potentialAction\":[{\"@type\":\"SearchAction\",\"target\":{\"@type\":\"EntryPoint\",\"urlTemplate\":\"https:\\\/\\\/energianucleare.eu\\\/en\\\/?s={search_term_string}\"},\"query-input\":{\"@type\":\"PropertyValueSpecification\",\"valueRequired\":true,\"valueName\":\"search_term_string\"}}],\"inLanguage\":\"en-US\"},{\"@type\":\"Person\",\"@id\":\"https:\\\/\\\/energianucleare.eu\\\/en\\\/#\\\/schema\\\/person\\\/2c3f466ad139658dfa60c575cf287fb7\",\"name\":\"Redazione Energia Nucleare\",\"image\":{\"@type\":\"ImageObject\",\"inLanguage\":\"en-US\",\"@id\":\"https:\\\/\\\/secure.gravatar.com\\\/avatar\\\/f7573bf636adfceb968c63d469c0889af0a78eb4935f321c17f76df121e056a6?s=96&d=mm&r=g\",\"url\":\"https:\\\/\\\/secure.gravatar.com\\\/avatar\\\/f7573bf636adfceb968c63d469c0889af0a78eb4935f321c17f76df121e056a6?s=96&d=mm&r=g\",\"contentUrl\":\"https:\\\/\\\/secure.gravatar.com\\\/avatar\\\/f7573bf636adfceb968c63d469c0889af0a78eb4935f321c17f76df121e056a6?s=96&d=mm&r=g\",\"caption\":\"Redazione Energia Nucleare\"},\"url\":\"https:\\\/\\\/energianucleare.eu\\\/en\\\/author\\\/redazione\\\/\"}]}<\/script>\n<!-- \/ Yoast SEO plugin. -->","yoast_head_json":{"title":"Orlen and Synthos Sign BWRX-300 SMR Agreement for W\u0142oc\u0142awek and Stawy Monowskie - Energia nucleare","description":"Orlen and Synthos Green Energy sign the BWRX-300 SMR deal: Orlen leads W\u0142oc\u0142awek, Synthos leads Stawy Monowskie.","robots":{"index":"index","follow":"follow","max-snippet":"max-snippet:-1","max-image-preview":"max-image-preview:large","max-video-preview":"max-video-preview:-1"},"canonical":"https:\/\/energianucleare.eu\/en\/orlen-and-synthos-sign-bwrx-300-smr-agreement-for-wloclawek-and-stawy-monowskie\/","og_locale":"en_US","og_type":"article","og_title":"Orlen and Synthos Sign BWRX-300 SMR Agreement for W\u0142oc\u0142awek and Stawy Monowskie - Energia nucleare","og_description":"Orlen and Synthos Green Energy sign the BWRX-300 SMR deal: Orlen leads W\u0142oc\u0142awek, Synthos leads Stawy Monowskie.","og_url":"https:\/\/energianucleare.eu\/en\/orlen-and-synthos-sign-bwrx-300-smr-agreement-for-wloclawek-and-stawy-monowskie\/","og_site_name":"Energia nucleare","article_published_time":"2026-10-24T06:28:42+00:00","og_image":[{"width":1536,"height":1024,"url":"https:\/\/energianucleare.eu\/wp-content\/uploads\/2026\/10\/publish_c0303cbf7e6f4d07b5dac8183e484683.jpg","type":"image\/jpeg"}],"author":"Redazione Energia Nucleare","twitter_card":"summary_large_image","twitter_misc":{"Written by":"Redazione Energia Nucleare","Est. reading time":"2 minutes"},"schema":{"@context":"https:\/\/schema.org","@graph":[{"@type":"Article","@id":"https:\/\/energianucleare.eu\/en\/orlen-and-synthos-sign-bwrx-300-smr-agreement-for-wloclawek-and-stawy-monowskie\/#article","isPartOf":{"@id":"https:\/\/energianucleare.eu\/en\/orlen-and-synthos-sign-bwrx-300-smr-agreement-for-wloclawek-and-stawy-monowskie\/"},"author":{"name":"Redazione Energia Nucleare","@id":"https:\/\/energianucleare.eu\/en\/#\/schema\/person\/2c3f466ad139658dfa60c575cf287fb7"},"headline":"Orlen and Synthos Sign BWRX-300 SMR Agreement for W\u0142oc\u0142awek and Stawy Monowskie","datePublished":"2026-10-24T06:28:42+00:00","mainEntityOfPage":{"@id":"https:\/\/energianucleare.eu\/en\/orlen-and-synthos-sign-bwrx-300-smr-agreement-for-wloclawek-and-stawy-monowskie\/"},"wordCount":430,"commentCount":0,"image":{"@id":"https:\/\/energianucleare.eu\/en\/orlen-and-synthos-sign-bwrx-300-smr-agreement-for-wloclawek-and-stawy-monowskie\/#primaryimage"},"thumbnailUrl":"https:\/\/energianucleare.eu\/wp-content\/uploads\/2026\/10\/publish_c0303cbf7e6f4d07b5dac8183e484683.jpg","inLanguage":"en-US","potentialAction":[{"@type":"CommentAction","name":"Comment","target":["https:\/\/energianucleare.eu\/en\/orlen-and-synthos-sign-bwrx-300-smr-agreement-for-wloclawek-and-stawy-monowskie\/#respond"]}]},{"@type":"WebPage","@id":"https:\/\/energianucleare.eu\/en\/orlen-and-synthos-sign-bwrx-300-smr-agreement-for-wloclawek-and-stawy-monowskie\/","url":"https:\/\/energianucleare.eu\/en\/orlen-and-synthos-sign-bwrx-300-smr-agreement-for-wloclawek-and-stawy-monowskie\/","name":"Orlen and Synthos Sign BWRX-300 SMR Agreement for W\u0142oc\u0142awek and Stawy Monowskie - Energia nucleare","isPartOf":{"@id":"https:\/\/energianucleare.eu\/en\/#website"},"primaryImageOfPage":{"@id":"https:\/\/energianucleare.eu\/en\/orlen-and-synthos-sign-bwrx-300-smr-agreement-for-wloclawek-and-stawy-monowskie\/#primaryimage"},"image":{"@id":"https:\/\/energianucleare.eu\/en\/orlen-and-synthos-sign-bwrx-300-smr-agreement-for-wloclawek-and-stawy-monowskie\/#primaryimage"},"thumbnailUrl":"https:\/\/energianucleare.eu\/wp-content\/uploads\/2026\/10\/publish_c0303cbf7e6f4d07b5dac8183e484683.jpg","datePublished":"2026-10-24T06:28:42+00:00","author":{"@id":"https:\/\/energianucleare.eu\/en\/#\/schema\/person\/2c3f466ad139658dfa60c575cf287fb7"},"description":"Orlen and Synthos Green Energy sign the BWRX-300 SMR deal: Orlen leads W\u0142oc\u0142awek, Synthos leads Stawy Monowskie.","breadcrumb":{"@id":"https:\/\/energianucleare.eu\/en\/orlen-and-synthos-sign-bwrx-300-smr-agreement-for-wloclawek-and-stawy-monowskie\/#breadcrumb"},"inLanguage":"en-US","potentialAction":[{"@type":"ReadAction","target":["https:\/\/energianucleare.eu\/en\/orlen-and-synthos-sign-bwrx-300-smr-agreement-for-wloclawek-and-stawy-monowskie\/"]}]},{"@type":"ImageObject","inLanguage":"en-US","@id":"https:\/\/energianucleare.eu\/en\/orlen-and-synthos-sign-bwrx-300-smr-agreement-for-wloclawek-and-stawy-monowskie\/#primaryimage","url":"https:\/\/energianucleare.eu\/wp-content\/uploads\/2026\/10\/publish_c0303cbf7e6f4d07b5dac8183e484683.jpg","contentUrl":"https:\/\/energianucleare.eu\/wp-content\/uploads\/2026\/10\/publish_c0303cbf7e6f4d07b5dac8183e484683.jpg","width":1536,"height":1024,"caption":"Illustrazione: Orlen e Synthos firmano l'intesa sugli SMR BWRX-300 a W\u0142oc\u0142awek e Stawy Monowskie"},{"@type":"BreadcrumbList","@id":"https:\/\/energianucleare.eu\/en\/orlen-and-synthos-sign-bwrx-300-smr-agreement-for-wloclawek-and-stawy-monowskie\/#breadcrumb","itemListElement":[{"@type":"ListItem","position":1,"name":"Home","item":"https:\/\/energianucleare.eu\/en\/"},{"@type":"ListItem","position":2,"name":"Orlen and Synthos Sign BWRX-300 SMR Agreement for W\u0142oc\u0142awek and Stawy Monowskie"}]},{"@type":"WebSite","@id":"https:\/\/energianucleare.eu\/en\/#website","url":"https:\/\/energianucleare.eu\/en\/","name":"Energia nucleare","description":"Notizie sul nucleare","potentialAction":[{"@type":"SearchAction","target":{"@type":"EntryPoint","urlTemplate":"https:\/\/energianucleare.eu\/en\/?s={search_term_string}"},"query-input":{"@type":"PropertyValueSpecification","valueRequired":true,"valueName":"search_term_string"}}],"inLanguage":"en-US"},{"@type":"Person","@id":"https:\/\/energianucleare.eu\/en\/#\/schema\/person\/2c3f466ad139658dfa60c575cf287fb7","name":"Redazione Energia Nucleare","image":{"@type":"ImageObject","inLanguage":"en-US","@id":"https:\/\/secure.gravatar.com\/avatar\/f7573bf636adfceb968c63d469c0889af0a78eb4935f321c17f76df121e056a6?s=96&d=mm&r=g","url":"https:\/\/secure.gravatar.com\/avatar\/f7573bf636adfceb968c63d469c0889af0a78eb4935f321c17f76df121e056a6?s=96&d=mm&r=g","contentUrl":"https:\/\/secure.gravatar.com\/avatar\/f7573bf636adfceb968c63d469c0889af0a78eb4935f321c17f76df121e056a6?s=96&d=mm&r=g","caption":"Redazione Energia Nucleare"},"url":"https:\/\/energianucleare.eu\/en\/author\/redazione\/"}]}},"_links":{"self":[{"href":"https:\/\/energianucleare.eu\/en\/wp-json\/wp\/v2\/posts\/4142","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/energianucleare.eu\/en\/wp-json\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/energianucleare.eu\/en\/wp-json\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"https:\/\/energianucleare.eu\/en\/wp-json\/wp\/v2\/users\/25"}],"replies":[{"embeddable":true,"href":"https:\/\/energianucleare.eu\/en\/wp-json\/wp\/v2\/comments?post=4142"}],"version-history":[{"count":0,"href":"https:\/\/energianucleare.eu\/en\/wp-json\/wp\/v2\/posts\/4142\/revisions"}],"wp:featuredmedia":[{"embeddable":true,"href":"https:\/\/energianucleare.eu\/en\/wp-json\/wp\/v2\/media\/4139"}],"wp:attachment":[{"href":"https:\/\/energianucleare.eu\/en\/wp-json\/wp\/v2\/media?parent=4142"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/energianucleare.eu\/en\/wp-json\/wp\/v2\/categories?post=4142"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/energianucleare.eu\/en\/wp-json\/wp\/v2\/tags?post=4142"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}