{"id":4562,"date":"2026-11-10T20:15:49","date_gmt":"2026-11-10T19:15:49","guid":{"rendered":"https:\/\/energianucleare.eu\/tgi-amiron-completes-preliminary-design-for-200-mw-ai-campus-in-aktau\/"},"modified":"2026-11-10T20:15:49","modified_gmt":"2026-11-10T19:15:49","slug":"tgi-amiron-completes-preliminary-design-for-200-mw-ai-campus-in-aktau","status":"publish","type":"post","link":"https:\/\/energianucleare.eu\/en\/tgi-amiron-completes-preliminary-design-for-200-mw-ai-campus-in-aktau\/","title":{"rendered":"TGI AMIRON Completes Preliminary Design for 200 MW AI Campus in Aktau"},"content":{"rendered":"<p><strong>TGI Solar Power Group<\/strong> and its subsidiary <strong>TGI AMIRON<\/strong> have completed the preliminary architectural and engineering design for an artificial intelligence data center campus in Aktau, Kazakhstan. The project covers 51.7 hectares in the Aktau Seaport special economic zone in the Mangystau region. The announcement was made on November 9, 2026.<\/p>\n<p>The electrical design provides for an initial capacity of <strong>200 MW<\/strong>, with a possible expansion to 500 MW. The companies stress that these are planning targets and that the capacity has not yet been secured. The campus includes liquid-cooled modular data centers, an administrative and operations center, warehouses and an energy microgrid. The first modules will come from the AXIPOD line, a TGI AMIRON brand.<\/p>\n<p>On the power side, the baseline solution combines on-site gas generation with battery storage systems. <strong>Small modular reactors (SMRs)<\/strong> are identified as a long-term option and are not part of the initial phases. For readers following nuclear energy, this is a signal to read with caution: nuclear is part of the conversation on powering data centers, but as a future possibility rather than a starting choice.<\/p>\n<p>The Kazakh context explains the interest. The country has plans for a data center valley in Ekibastuz and expects at least 2.4 GW of nuclear capacity by 2035. TGI AMIRON is a joint venture with Kazakhstan&#8217;s AMIRON and is a registered participant of the special economic zone, which provides the regulatory framework for the development. The campus is the centerpiece of the program along the US-Kazakhstan technology corridor.<\/p>\n<p>Moving to Phase 1 depends on power supply, permits, land approvals, financing and technical and commercial partners. Daniel Brody, Chief Information Officer of TGI Group, said the focus is now on power, permits and partners. If Kazakhstan moves forward with its national nuclear program, SMRs could become, at a later stage, the stable, low-emission source for the campus.<\/p>\n","protected":false},"excerpt":{"rendered":"<p>TGI Solar Power Group and TGI AMIRON have finished the preliminary design of an AI data center campus on 51.7 hectares in the Aktau Seaport special economic zone in Kazakhstan. Baseline power comes from gas with battery storage, while small modular reactors remain a long-term option.<\/p>\n","protected":false},"author":25,"featured_media":4559,"comment_status":"open","ping_status":"open","sticky":false,"template":"","format":"standard","meta":{"_acf_changed":false,"footnotes":""},"categories":[],"tags":[],"class_list":["post-4562","post","type-post","status-publish","format-standard","has-post-thumbnail","hentry"],"acf":[],"yoast_head":"<!-- This site is optimized with the Yoast SEO plugin v28.7 - https:\/\/yoast.com\/product\/yoast-seo-wordpress\/ -->\n<title>TGI AMIRON Completes Preliminary Design for 200 MW AI Campus in Aktau - Energia nucleare<\/title>\n<meta name=\"description\" content=\"TGI AMIRON completes preliminary design of the Aktau AI campus: 200 MW initially, gas and batteries, SMRs only long term.\" \/>\n<meta name=\"robots\" content=\"index, follow, max-snippet:-1, max-image-preview:large, max-video-preview:-1\" \/>\n<link rel=\"canonical\" href=\"https:\/\/energianucleare.eu\/en\/tgi-amiron-completes-preliminary-design-for-200-mw-ai-campus-in-aktau\/\" \/>\n<meta property=\"og:locale\" content=\"en_US\" \/>\n<meta property=\"og:type\" content=\"article\" \/>\n<meta property=\"og:title\" content=\"TGI AMIRON Completes Preliminary Design for 200 MW AI Campus in Aktau - Energia nucleare\" \/>\n<meta property=\"og:description\" content=\"TGI AMIRON completes preliminary design of the Aktau AI campus: 200 MW initially, gas and batteries, SMRs only long term.\" \/>\n<meta property=\"og:url\" content=\"https:\/\/energianucleare.eu\/en\/tgi-amiron-completes-preliminary-design-for-200-mw-ai-campus-in-aktau\/\" \/>\n<meta property=\"og:site_name\" content=\"Energia nucleare\" \/>\n<meta property=\"article:published_time\" content=\"2026-11-10T19:15:49+00:00\" \/>\n<meta property=\"og:image\" content=\"https:\/\/energianucleare.eu\/wp-content\/uploads\/2026\/11\/publish_9e2cfde683c340cdb7caf20dbfb728ce.jpg\" \/>\n\t<meta property=\"og:image:width\" content=\"1536\" \/>\n\t<meta property=\"og:image:height\" content=\"1024\" \/>\n\t<meta property=\"og:image:type\" content=\"image\/jpeg\" \/>\n<meta name=\"author\" content=\"Redazione Energia Nucleare\" \/>\n<meta name=\"twitter:card\" content=\"summary_large_image\" \/>\n<meta name=\"twitter:label1\" content=\"Written by\" \/>\n\t<meta name=\"twitter:data1\" content=\"Redazione Energia Nucleare\" \/>\n\t<meta name=\"twitter:label2\" content=\"Est. reading time\" \/>\n\t<meta name=\"twitter:data2\" content=\"2 minutes\" \/>\n<script type=\"application\/ld+json\" class=\"yoast-schema-graph\">{\"@context\":\"https:\\\/\\\/schema.org\",\"@graph\":[{\"@type\":\"Article\",\"@id\":\"https:\\\/\\\/energianucleare.eu\\\/en\\\/tgi-amiron-completes-preliminary-design-for-200-mw-ai-campus-in-aktau\\\/#article\",\"isPartOf\":{\"@id\":\"https:\\\/\\\/energianucleare.eu\\\/en\\\/tgi-amiron-completes-preliminary-design-for-200-mw-ai-campus-in-aktau\\\/\"},\"author\":{\"name\":\"Redazione Energia Nucleare\",\"@id\":\"https:\\\/\\\/energianucleare.eu\\\/en\\\/#\\\/schema\\\/person\\\/2c3f466ad139658dfa60c575cf287fb7\"},\"headline\":\"TGI AMIRON Completes Preliminary Design for 200 MW AI Campus in Aktau\",\"datePublished\":\"2026-11-10T19:15:49+00:00\",\"mainEntityOfPage\":{\"@id\":\"https:\\\/\\\/energianucleare.eu\\\/en\\\/tgi-amiron-completes-preliminary-design-for-200-mw-ai-campus-in-aktau\\\/\"},\"wordCount\":312,\"commentCount\":0,\"image\":{\"@id\":\"https:\\\/\\\/energianucleare.eu\\\/en\\\/tgi-amiron-completes-preliminary-design-for-200-mw-ai-campus-in-aktau\\\/#primaryimage\"},\"thumbnailUrl\":\"https:\\\/\\\/energianucleare.eu\\\/wp-content\\\/uploads\\\/2026\\\/11\\\/publish_9e2cfde683c340cdb7caf20dbfb728ce.jpg\",\"inLanguage\":\"en-US\",\"potentialAction\":[{\"@type\":\"CommentAction\",\"name\":\"Comment\",\"target\":[\"https:\\\/\\\/energianucleare.eu\\\/en\\\/tgi-amiron-completes-preliminary-design-for-200-mw-ai-campus-in-aktau\\\/#respond\"]}]},{\"@type\":\"WebPage\",\"@id\":\"https:\\\/\\\/energianucleare.eu\\\/en\\\/tgi-amiron-completes-preliminary-design-for-200-mw-ai-campus-in-aktau\\\/\",\"url\":\"https:\\\/\\\/energianucleare.eu\\\/en\\\/tgi-amiron-completes-preliminary-design-for-200-mw-ai-campus-in-aktau\\\/\",\"name\":\"TGI AMIRON Completes Preliminary Design for 200 MW AI Campus in Aktau - Energia nucleare\",\"isPartOf\":{\"@id\":\"https:\\\/\\\/energianucleare.eu\\\/en\\\/#website\"},\"primaryImageOfPage\":{\"@id\":\"https:\\\/\\\/energianucleare.eu\\\/en\\\/tgi-amiron-completes-preliminary-design-for-200-mw-ai-campus-in-aktau\\\/#primaryimage\"},\"image\":{\"@id\":\"https:\\\/\\\/energianucleare.eu\\\/en\\\/tgi-amiron-completes-preliminary-design-for-200-mw-ai-campus-in-aktau\\\/#primaryimage\"},\"thumbnailUrl\":\"https:\\\/\\\/energianucleare.eu\\\/wp-content\\\/uploads\\\/2026\\\/11\\\/publish_9e2cfde683c340cdb7caf20dbfb728ce.jpg\",\"datePublished\":\"2026-11-10T19:15:49+00:00\",\"author\":{\"@id\":\"https:\\\/\\\/energianucleare.eu\\\/en\\\/#\\\/schema\\\/person\\\/2c3f466ad139658dfa60c575cf287fb7\"},\"description\":\"TGI AMIRON completes preliminary design of the Aktau AI campus: 200 MW initially, gas and batteries, SMRs only long term.\",\"breadcrumb\":{\"@id\":\"https:\\\/\\\/energianucleare.eu\\\/en\\\/tgi-amiron-completes-preliminary-design-for-200-mw-ai-campus-in-aktau\\\/#breadcrumb\"},\"inLanguage\":\"en-US\",\"potentialAction\":[{\"@type\":\"ReadAction\",\"target\":[\"https:\\\/\\\/energianucleare.eu\\\/en\\\/tgi-amiron-completes-preliminary-design-for-200-mw-ai-campus-in-aktau\\\/\"]}]},{\"@type\":\"ImageObject\",\"inLanguage\":\"en-US\",\"@id\":\"https:\\\/\\\/energianucleare.eu\\\/en\\\/tgi-amiron-completes-preliminary-design-for-200-mw-ai-campus-in-aktau\\\/#primaryimage\",\"url\":\"https:\\\/\\\/energianucleare.eu\\\/wp-content\\\/uploads\\\/2026\\\/11\\\/publish_9e2cfde683c340cdb7caf20dbfb728ce.jpg\",\"contentUrl\":\"https:\\\/\\\/energianucleare.eu\\\/wp-content\\\/uploads\\\/2026\\\/11\\\/publish_9e2cfde683c340cdb7caf20dbfb728ce.jpg\",\"width\":1536,\"height\":1024},{\"@type\":\"BreadcrumbList\",\"@id\":\"https:\\\/\\\/energianucleare.eu\\\/en\\\/tgi-amiron-completes-preliminary-design-for-200-mw-ai-campus-in-aktau\\\/#breadcrumb\",\"itemListElement\":[{\"@type\":\"ListItem\",\"position\":1,\"name\":\"Home\",\"item\":\"https:\\\/\\\/energianucleare.eu\\\/en\\\/\"},{\"@type\":\"ListItem\",\"position\":2,\"name\":\"TGI AMIRON Completes Preliminary Design for 200 MW AI Campus in Aktau\"}]},{\"@type\":\"WebSite\",\"@id\":\"https:\\\/\\\/energianucleare.eu\\\/en\\\/#website\",\"url\":\"https:\\\/\\\/energianucleare.eu\\\/en\\\/\",\"name\":\"Energia nucleare\",\"description\":\"Notizie sul nucleare\",\"potentialAction\":[{\"@type\":\"SearchAction\",\"target\":{\"@type\":\"EntryPoint\",\"urlTemplate\":\"https:\\\/\\\/energianucleare.eu\\\/en\\\/?s={search_term_string}\"},\"query-input\":{\"@type\":\"PropertyValueSpecification\",\"valueRequired\":true,\"valueName\":\"search_term_string\"}}],\"inLanguage\":\"en-US\"},{\"@type\":\"Person\",\"@id\":\"https:\\\/\\\/energianucleare.eu\\\/en\\\/#\\\/schema\\\/person\\\/2c3f466ad139658dfa60c575cf287fb7\",\"name\":\"Redazione Energia Nucleare\",\"image\":{\"@type\":\"ImageObject\",\"inLanguage\":\"en-US\",\"@id\":\"https:\\\/\\\/secure.gravatar.com\\\/avatar\\\/f7573bf636adfceb968c63d469c0889af0a78eb4935f321c17f76df121e056a6?s=96&d=mm&r=g\",\"url\":\"https:\\\/\\\/secure.gravatar.com\\\/avatar\\\/f7573bf636adfceb968c63d469c0889af0a78eb4935f321c17f76df121e056a6?s=96&d=mm&r=g\",\"contentUrl\":\"https:\\\/\\\/secure.gravatar.com\\\/avatar\\\/f7573bf636adfceb968c63d469c0889af0a78eb4935f321c17f76df121e056a6?s=96&d=mm&r=g\",\"caption\":\"Redazione Energia Nucleare\"},\"url\":\"https:\\\/\\\/energianucleare.eu\\\/en\\\/author\\\/redazione\\\/\"}]}<\/script>\n<!-- \/ Yoast SEO plugin. -->","yoast_head_json":{"title":"TGI AMIRON Completes Preliminary Design for 200 MW AI Campus in Aktau - Energia nucleare","description":"TGI AMIRON completes preliminary design of the Aktau AI campus: 200 MW initially, gas and batteries, SMRs only long term.","robots":{"index":"index","follow":"follow","max-snippet":"max-snippet:-1","max-image-preview":"max-image-preview:large","max-video-preview":"max-video-preview:-1"},"canonical":"https:\/\/energianucleare.eu\/en\/tgi-amiron-completes-preliminary-design-for-200-mw-ai-campus-in-aktau\/","og_locale":"en_US","og_type":"article","og_title":"TGI AMIRON Completes Preliminary Design for 200 MW AI Campus in Aktau - Energia nucleare","og_description":"TGI AMIRON completes preliminary design of the Aktau AI campus: 200 MW initially, gas and batteries, SMRs only long term.","og_url":"https:\/\/energianucleare.eu\/en\/tgi-amiron-completes-preliminary-design-for-200-mw-ai-campus-in-aktau\/","og_site_name":"Energia nucleare","article_published_time":"2026-11-10T19:15:49+00:00","og_image":[{"width":1536,"height":1024,"url":"https:\/\/energianucleare.eu\/wp-content\/uploads\/2026\/11\/publish_9e2cfde683c340cdb7caf20dbfb728ce.jpg","type":"image\/jpeg"}],"author":"Redazione Energia Nucleare","twitter_card":"summary_large_image","twitter_misc":{"Written by":"Redazione Energia Nucleare","Est. reading time":"2 minutes"},"schema":{"@context":"https:\/\/schema.org","@graph":[{"@type":"Article","@id":"https:\/\/energianucleare.eu\/en\/tgi-amiron-completes-preliminary-design-for-200-mw-ai-campus-in-aktau\/#article","isPartOf":{"@id":"https:\/\/energianucleare.eu\/en\/tgi-amiron-completes-preliminary-design-for-200-mw-ai-campus-in-aktau\/"},"author":{"name":"Redazione Energia Nucleare","@id":"https:\/\/energianucleare.eu\/en\/#\/schema\/person\/2c3f466ad139658dfa60c575cf287fb7"},"headline":"TGI AMIRON Completes Preliminary Design for 200 MW AI Campus in Aktau","datePublished":"2026-11-10T19:15:49+00:00","mainEntityOfPage":{"@id":"https:\/\/energianucleare.eu\/en\/tgi-amiron-completes-preliminary-design-for-200-mw-ai-campus-in-aktau\/"},"wordCount":312,"commentCount":0,"image":{"@id":"https:\/\/energianucleare.eu\/en\/tgi-amiron-completes-preliminary-design-for-200-mw-ai-campus-in-aktau\/#primaryimage"},"thumbnailUrl":"https:\/\/energianucleare.eu\/wp-content\/uploads\/2026\/11\/publish_9e2cfde683c340cdb7caf20dbfb728ce.jpg","inLanguage":"en-US","potentialAction":[{"@type":"CommentAction","name":"Comment","target":["https:\/\/energianucleare.eu\/en\/tgi-amiron-completes-preliminary-design-for-200-mw-ai-campus-in-aktau\/#respond"]}]},{"@type":"WebPage","@id":"https:\/\/energianucleare.eu\/en\/tgi-amiron-completes-preliminary-design-for-200-mw-ai-campus-in-aktau\/","url":"https:\/\/energianucleare.eu\/en\/tgi-amiron-completes-preliminary-design-for-200-mw-ai-campus-in-aktau\/","name":"TGI AMIRON Completes Preliminary Design for 200 MW AI Campus in Aktau - Energia nucleare","isPartOf":{"@id":"https:\/\/energianucleare.eu\/en\/#website"},"primaryImageOfPage":{"@id":"https:\/\/energianucleare.eu\/en\/tgi-amiron-completes-preliminary-design-for-200-mw-ai-campus-in-aktau\/#primaryimage"},"image":{"@id":"https:\/\/energianucleare.eu\/en\/tgi-amiron-completes-preliminary-design-for-200-mw-ai-campus-in-aktau\/#primaryimage"},"thumbnailUrl":"https:\/\/energianucleare.eu\/wp-content\/uploads\/2026\/11\/publish_9e2cfde683c340cdb7caf20dbfb728ce.jpg","datePublished":"2026-11-10T19:15:49+00:00","author":{"@id":"https:\/\/energianucleare.eu\/en\/#\/schema\/person\/2c3f466ad139658dfa60c575cf287fb7"},"description":"TGI AMIRON completes preliminary design of the Aktau AI campus: 200 MW initially, gas and batteries, SMRs only long term.","breadcrumb":{"@id":"https:\/\/energianucleare.eu\/en\/tgi-amiron-completes-preliminary-design-for-200-mw-ai-campus-in-aktau\/#breadcrumb"},"inLanguage":"en-US","potentialAction":[{"@type":"ReadAction","target":["https:\/\/energianucleare.eu\/en\/tgi-amiron-completes-preliminary-design-for-200-mw-ai-campus-in-aktau\/"]}]},{"@type":"ImageObject","inLanguage":"en-US","@id":"https:\/\/energianucleare.eu\/en\/tgi-amiron-completes-preliminary-design-for-200-mw-ai-campus-in-aktau\/#primaryimage","url":"https:\/\/energianucleare.eu\/wp-content\/uploads\/2026\/11\/publish_9e2cfde683c340cdb7caf20dbfb728ce.jpg","contentUrl":"https:\/\/energianucleare.eu\/wp-content\/uploads\/2026\/11\/publish_9e2cfde683c340cdb7caf20dbfb728ce.jpg","width":1536,"height":1024},{"@type":"BreadcrumbList","@id":"https:\/\/energianucleare.eu\/en\/tgi-amiron-completes-preliminary-design-for-200-mw-ai-campus-in-aktau\/#breadcrumb","itemListElement":[{"@type":"ListItem","position":1,"name":"Home","item":"https:\/\/energianucleare.eu\/en\/"},{"@type":"ListItem","position":2,"name":"TGI AMIRON Completes Preliminary Design for 200 MW AI Campus in Aktau"}]},{"@type":"WebSite","@id":"https:\/\/energianucleare.eu\/en\/#website","url":"https:\/\/energianucleare.eu\/en\/","name":"Energia nucleare","description":"Notizie sul nucleare","potentialAction":[{"@type":"SearchAction","target":{"@type":"EntryPoint","urlTemplate":"https:\/\/energianucleare.eu\/en\/?s={search_term_string}"},"query-input":{"@type":"PropertyValueSpecification","valueRequired":true,"valueName":"search_term_string"}}],"inLanguage":"en-US"},{"@type":"Person","@id":"https:\/\/energianucleare.eu\/en\/#\/schema\/person\/2c3f466ad139658dfa60c575cf287fb7","name":"Redazione Energia Nucleare","image":{"@type":"ImageObject","inLanguage":"en-US","@id":"https:\/\/secure.gravatar.com\/avatar\/f7573bf636adfceb968c63d469c0889af0a78eb4935f321c17f76df121e056a6?s=96&d=mm&r=g","url":"https:\/\/secure.gravatar.com\/avatar\/f7573bf636adfceb968c63d469c0889af0a78eb4935f321c17f76df121e056a6?s=96&d=mm&r=g","contentUrl":"https:\/\/secure.gravatar.com\/avatar\/f7573bf636adfceb968c63d469c0889af0a78eb4935f321c17f76df121e056a6?s=96&d=mm&r=g","caption":"Redazione Energia Nucleare"},"url":"https:\/\/energianucleare.eu\/en\/author\/redazione\/"}]}},"_links":{"self":[{"href":"https:\/\/energianucleare.eu\/en\/wp-json\/wp\/v2\/posts\/4562","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/energianucleare.eu\/en\/wp-json\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/energianucleare.eu\/en\/wp-json\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"https:\/\/energianucleare.eu\/en\/wp-json\/wp\/v2\/users\/25"}],"replies":[{"embeddable":true,"href":"https:\/\/energianucleare.eu\/en\/wp-json\/wp\/v2\/comments?post=4562"}],"version-history":[{"count":0,"href":"https:\/\/energianucleare.eu\/en\/wp-json\/wp\/v2\/posts\/4562\/revisions"}],"wp:featuredmedia":[{"embeddable":true,"href":"https:\/\/energianucleare.eu\/en\/wp-json\/wp\/v2\/media\/4559"}],"wp:attachment":[{"href":"https:\/\/energianucleare.eu\/en\/wp-json\/wp\/v2\/media?parent=4562"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/energianucleare.eu\/en\/wp-json\/wp\/v2\/categories?post=4562"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/energianucleare.eu\/en\/wp-json\/wp\/v2\/tags?post=4562"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}