{"id":4619,"date":"2026-11-13T08:02:37","date_gmt":"2026-11-13T07:02:37","guid":{"rendered":"https:\/\/energianucleare.eu\/ghana-earmarks-200-million-to-prepare-its-first-nuclear-power-plant\/"},"modified":"2026-11-13T08:02:37","modified_gmt":"2026-11-13T07:02:37","slug":"ghana-earmarks-200-million-to-prepare-its-first-nuclear-power-plant","status":"publish","type":"post","link":"https:\/\/energianucleare.eu\/en\/ghana-earmarks-200-million-to-prepare-its-first-nuclear-power-plant\/","title":{"rendered":"Ghana Earmarks $200 Million to Prepare Its First Nuclear Power Plant"},"content":{"rendered":"<p>Ghana will invest <strong>$200 million<\/strong> in a 24-month nuclear readiness programme, running from January 2027 to December 2028. Finance Minister Cassiel Ato Forson announced the plan on 12 November while presenting the 2027 budget to Parliament.<\/p>\n<p>The goal is to reach December 2028 with all conditions in place to sign an engineering, procurement, construction and financing contract for a baseload nuclear power plant. Forson was blunt about the timeline: being prepared in 2028 does not mean producing nuclear electricity in 2028. The programme is meant to line up regulations, skills and project design before ground is broken.<\/p>\n<p>On the workforce side, the government will train <strong>more than 2,000 scientists<\/strong> to build local expertise. The minister described this as a precondition for a safe and reliable transition to nuclear power. The country aims to operate the plant with its own personnel rather than depend on foreign technicians over the long term.<\/p>\n<p>The ownership model is clear-cut. The plant will be <strong>fully state-owned<\/strong> and treated as a strategic national asset. Forson ruled out the independent power producer model, in which a private operator sells electricity to the grid. The state will retain control of generation and transmission, in line with the concept of energy sovereignty stressed in his speech.<\/p>\n<p>Nuclear power is part of a broader energy package within the $10 billion programme known as the New Economy. The government wants to eliminate emergency power plants by 2030 and cut the cost of generation from about 16 to 8 US cents per kilowatt-hour or less. It also plans $500 million for the transmission network and two million prepaid meters. A baseload plant would sit alongside the hydroelectric and thermal capacity that currently underpins the system.<\/p>\n<p>A potential partner is already in the picture. According to Ghanaian press reports, Accra has opened talks with Russia&#8217;s <strong>Rosatom<\/strong> on the country&#8217;s first plant. A memorandum of understanding with Rosatom dates back to 2015, when a 1,200-megawatt reactor was under discussion. The 2027 budget, however, names neither the supplier nor the technology, which will be determined during the preparation phase.<\/p>\n<p>Forson cited the construction of the Akosombo Dam as a precedent for investing in infrastructure meant to serve future generations. Once the 2027-2028 period ends, Ghana will face its most concrete decision yet: choosing a partner and a reactor and signing the contract. If the schedule holds, it would join the group of African countries with civil nuclear power under construction.<\/p>\n","protected":false},"excerpt":{"rendered":"<p>Finance Minister Ato Forson told Parliament that Ghana will spend $200 million between January 2027 and December 2028 to prepare its first nuclear power plant. More than 2,000 scientists will be trained, and the plant will remain fully state-owned.<\/p>\n","protected":false},"author":25,"featured_media":4616,"comment_status":"open","ping_status":"open","sticky":false,"template":"","format":"standard","meta":{"_acf_changed":false,"footnotes":""},"categories":[],"tags":[],"class_list":["post-4619","post","type-post","status-publish","format-standard","has-post-thumbnail","hentry"],"acf":[],"yoast_head":"<!-- This site is optimized with the Yoast SEO plugin v28.7 - https:\/\/yoast.com\/product\/yoast-seo-wordpress\/ -->\n<title>Ghana Earmarks $200 Million to Prepare Its First Nuclear Power Plant - Energia nucleare<\/title>\n<meta name=\"description\" content=\"Ghana commits $200M to its first nuclear plant: 2027-2028 readiness programme, 2,000 scientists trained, fully state-owned plant.\" \/>\n<meta name=\"robots\" content=\"index, follow, max-snippet:-1, max-image-preview:large, max-video-preview:-1\" \/>\n<link rel=\"canonical\" href=\"https:\/\/energianucleare.eu\/en\/ghana-earmarks-200-million-to-prepare-its-first-nuclear-power-plant\/\" \/>\n<meta property=\"og:locale\" content=\"en_US\" \/>\n<meta property=\"og:type\" content=\"article\" \/>\n<meta property=\"og:title\" content=\"Ghana Earmarks $200 Million to Prepare Its First Nuclear Power Plant - Energia nucleare\" \/>\n<meta property=\"og:description\" content=\"Ghana commits $200M to its first nuclear plant: 2027-2028 readiness programme, 2,000 scientists trained, fully state-owned plant.\" \/>\n<meta property=\"og:url\" content=\"https:\/\/energianucleare.eu\/en\/ghana-earmarks-200-million-to-prepare-its-first-nuclear-power-plant\/\" \/>\n<meta property=\"og:site_name\" content=\"Energia nucleare\" \/>\n<meta property=\"article:published_time\" content=\"2026-11-13T07:02:37+00:00\" \/>\n<meta property=\"og:image\" content=\"https:\/\/energianucleare.eu\/wp-content\/uploads\/2026\/11\/ghana-nucleare-centrale-torri-vapore-mare.jpg\" \/>\n\t<meta property=\"og:image:width\" content=\"1536\" \/>\n\t<meta property=\"og:image:height\" content=\"1024\" \/>\n\t<meta property=\"og:image:type\" content=\"image\/jpeg\" \/>\n<meta name=\"author\" content=\"Redazione Energia Nucleare\" \/>\n<meta name=\"twitter:card\" content=\"summary_large_image\" \/>\n<meta name=\"twitter:label1\" content=\"Written by\" \/>\n\t<meta name=\"twitter:data1\" content=\"Redazione Energia Nucleare\" \/>\n\t<meta name=\"twitter:label2\" content=\"Est. reading time\" \/>\n\t<meta name=\"twitter:data2\" content=\"2 minutes\" \/>\n<script type=\"application\/ld+json\" class=\"yoast-schema-graph\">{\"@context\":\"https:\\\/\\\/schema.org\",\"@graph\":[{\"@type\":\"Article\",\"@id\":\"https:\\\/\\\/energianucleare.eu\\\/en\\\/ghana-earmarks-200-million-to-prepare-its-first-nuclear-power-plant\\\/#article\",\"isPartOf\":{\"@id\":\"https:\\\/\\\/energianucleare.eu\\\/en\\\/ghana-earmarks-200-million-to-prepare-its-first-nuclear-power-plant\\\/\"},\"author\":{\"name\":\"Redazione Energia Nucleare\",\"@id\":\"https:\\\/\\\/energianucleare.eu\\\/en\\\/#\\\/schema\\\/person\\\/2c3f466ad139658dfa60c575cf287fb7\"},\"headline\":\"Ghana Earmarks $200 Million to Prepare Its First Nuclear Power Plant\",\"datePublished\":\"2026-11-13T07:02:37+00:00\",\"mainEntityOfPage\":{\"@id\":\"https:\\\/\\\/energianucleare.eu\\\/en\\\/ghana-earmarks-200-million-to-prepare-its-first-nuclear-power-plant\\\/\"},\"wordCount\":401,\"commentCount\":0,\"image\":{\"@id\":\"https:\\\/\\\/energianucleare.eu\\\/en\\\/ghana-earmarks-200-million-to-prepare-its-first-nuclear-power-plant\\\/#primaryimage\"},\"thumbnailUrl\":\"https:\\\/\\\/energianucleare.eu\\\/wp-content\\\/uploads\\\/2026\\\/11\\\/ghana-nucleare-centrale-torri-vapore-mare.jpg\",\"inLanguage\":\"en-US\",\"potentialAction\":[{\"@type\":\"CommentAction\",\"name\":\"Comment\",\"target\":[\"https:\\\/\\\/energianucleare.eu\\\/en\\\/ghana-earmarks-200-million-to-prepare-its-first-nuclear-power-plant\\\/#respond\"]}]},{\"@type\":\"WebPage\",\"@id\":\"https:\\\/\\\/energianucleare.eu\\\/en\\\/ghana-earmarks-200-million-to-prepare-its-first-nuclear-power-plant\\\/\",\"url\":\"https:\\\/\\\/energianucleare.eu\\\/en\\\/ghana-earmarks-200-million-to-prepare-its-first-nuclear-power-plant\\\/\",\"name\":\"Ghana Earmarks $200 Million to Prepare Its First Nuclear Power Plant - Energia nucleare\",\"isPartOf\":{\"@id\":\"https:\\\/\\\/energianucleare.eu\\\/en\\\/#website\"},\"primaryImageOfPage\":{\"@id\":\"https:\\\/\\\/energianucleare.eu\\\/en\\\/ghana-earmarks-200-million-to-prepare-its-first-nuclear-power-plant\\\/#primaryimage\"},\"image\":{\"@id\":\"https:\\\/\\\/energianucleare.eu\\\/en\\\/ghana-earmarks-200-million-to-prepare-its-first-nuclear-power-plant\\\/#primaryimage\"},\"thumbnailUrl\":\"https:\\\/\\\/energianucleare.eu\\\/wp-content\\\/uploads\\\/2026\\\/11\\\/ghana-nucleare-centrale-torri-vapore-mare.jpg\",\"datePublished\":\"2026-11-13T07:02:37+00:00\",\"author\":{\"@id\":\"https:\\\/\\\/energianucleare.eu\\\/en\\\/#\\\/schema\\\/person\\\/2c3f466ad139658dfa60c575cf287fb7\"},\"description\":\"Ghana commits $200M to its first nuclear plant: 2027-2028 readiness programme, 2,000 scientists trained, fully state-owned plant.\",\"breadcrumb\":{\"@id\":\"https:\\\/\\\/energianucleare.eu\\\/en\\\/ghana-earmarks-200-million-to-prepare-its-first-nuclear-power-plant\\\/#breadcrumb\"},\"inLanguage\":\"en-US\",\"potentialAction\":[{\"@type\":\"ReadAction\",\"target\":[\"https:\\\/\\\/energianucleare.eu\\\/en\\\/ghana-earmarks-200-million-to-prepare-its-first-nuclear-power-plant\\\/\"]}]},{\"@type\":\"ImageObject\",\"inLanguage\":\"en-US\",\"@id\":\"https:\\\/\\\/energianucleare.eu\\\/en\\\/ghana-earmarks-200-million-to-prepare-its-first-nuclear-power-plant\\\/#primaryimage\",\"url\":\"https:\\\/\\\/energianucleare.eu\\\/wp-content\\\/uploads\\\/2026\\\/11\\\/ghana-nucleare-centrale-torri-vapore-mare.jpg\",\"contentUrl\":\"https:\\\/\\\/energianucleare.eu\\\/wp-content\\\/uploads\\\/2026\\\/11\\\/ghana-nucleare-centrale-torri-vapore-mare.jpg\",\"width\":1536,\"height\":1024,\"caption\":\"Centrale nucleare con due torri di raffreddamento in cemento che emettono vapore, cupola bianca del reattore e cielo azzurro sopra il mare\"},{\"@type\":\"BreadcrumbList\",\"@id\":\"https:\\\/\\\/energianucleare.eu\\\/en\\\/ghana-earmarks-200-million-to-prepare-its-first-nuclear-power-plant\\\/#breadcrumb\",\"itemListElement\":[{\"@type\":\"ListItem\",\"position\":1,\"name\":\"Home\",\"item\":\"https:\\\/\\\/energianucleare.eu\\\/en\\\/\"},{\"@type\":\"ListItem\",\"position\":2,\"name\":\"Ghana Earmarks $200 Million to Prepare Its First Nuclear Power Plant\"}]},{\"@type\":\"WebSite\",\"@id\":\"https:\\\/\\\/energianucleare.eu\\\/en\\\/#website\",\"url\":\"https:\\\/\\\/energianucleare.eu\\\/en\\\/\",\"name\":\"Energia nucleare\",\"description\":\"Notizie sul nucleare\",\"potentialAction\":[{\"@type\":\"SearchAction\",\"target\":{\"@type\":\"EntryPoint\",\"urlTemplate\":\"https:\\\/\\\/energianucleare.eu\\\/en\\\/?s={search_term_string}\"},\"query-input\":{\"@type\":\"PropertyValueSpecification\",\"valueRequired\":true,\"valueName\":\"search_term_string\"}}],\"inLanguage\":\"en-US\"},{\"@type\":\"Person\",\"@id\":\"https:\\\/\\\/energianucleare.eu\\\/en\\\/#\\\/schema\\\/person\\\/2c3f466ad139658dfa60c575cf287fb7\",\"name\":\"Redazione Energia Nucleare\",\"image\":{\"@type\":\"ImageObject\",\"inLanguage\":\"en-US\",\"@id\":\"https:\\\/\\\/secure.gravatar.com\\\/avatar\\\/f7573bf636adfceb968c63d469c0889af0a78eb4935f321c17f76df121e056a6?s=96&d=mm&r=g\",\"url\":\"https:\\\/\\\/secure.gravatar.com\\\/avatar\\\/f7573bf636adfceb968c63d469c0889af0a78eb4935f321c17f76df121e056a6?s=96&d=mm&r=g\",\"contentUrl\":\"https:\\\/\\\/secure.gravatar.com\\\/avatar\\\/f7573bf636adfceb968c63d469c0889af0a78eb4935f321c17f76df121e056a6?s=96&d=mm&r=g\",\"caption\":\"Redazione Energia Nucleare\"},\"url\":\"https:\\\/\\\/energianucleare.eu\\\/en\\\/author\\\/redazione\\\/\"}]}<\/script>\n<!-- \/ Yoast SEO plugin. -->","yoast_head_json":{"title":"Ghana Earmarks $200 Million to Prepare Its First Nuclear Power Plant - Energia nucleare","description":"Ghana commits $200M to its first nuclear plant: 2027-2028 readiness programme, 2,000 scientists trained, fully state-owned plant.","robots":{"index":"index","follow":"follow","max-snippet":"max-snippet:-1","max-image-preview":"max-image-preview:large","max-video-preview":"max-video-preview:-1"},"canonical":"https:\/\/energianucleare.eu\/en\/ghana-earmarks-200-million-to-prepare-its-first-nuclear-power-plant\/","og_locale":"en_US","og_type":"article","og_title":"Ghana Earmarks $200 Million to Prepare Its First Nuclear Power Plant - Energia nucleare","og_description":"Ghana commits $200M to its first nuclear plant: 2027-2028 readiness programme, 2,000 scientists trained, fully state-owned plant.","og_url":"https:\/\/energianucleare.eu\/en\/ghana-earmarks-200-million-to-prepare-its-first-nuclear-power-plant\/","og_site_name":"Energia nucleare","article_published_time":"2026-11-13T07:02:37+00:00","og_image":[{"width":1536,"height":1024,"url":"https:\/\/energianucleare.eu\/wp-content\/uploads\/2026\/11\/ghana-nucleare-centrale-torri-vapore-mare.jpg","type":"image\/jpeg"}],"author":"Redazione Energia Nucleare","twitter_card":"summary_large_image","twitter_misc":{"Written by":"Redazione Energia Nucleare","Est. reading time":"2 minutes"},"schema":{"@context":"https:\/\/schema.org","@graph":[{"@type":"Article","@id":"https:\/\/energianucleare.eu\/en\/ghana-earmarks-200-million-to-prepare-its-first-nuclear-power-plant\/#article","isPartOf":{"@id":"https:\/\/energianucleare.eu\/en\/ghana-earmarks-200-million-to-prepare-its-first-nuclear-power-plant\/"},"author":{"name":"Redazione Energia Nucleare","@id":"https:\/\/energianucleare.eu\/en\/#\/schema\/person\/2c3f466ad139658dfa60c575cf287fb7"},"headline":"Ghana Earmarks $200 Million to Prepare Its First Nuclear Power Plant","datePublished":"2026-11-13T07:02:37+00:00","mainEntityOfPage":{"@id":"https:\/\/energianucleare.eu\/en\/ghana-earmarks-200-million-to-prepare-its-first-nuclear-power-plant\/"},"wordCount":401,"commentCount":0,"image":{"@id":"https:\/\/energianucleare.eu\/en\/ghana-earmarks-200-million-to-prepare-its-first-nuclear-power-plant\/#primaryimage"},"thumbnailUrl":"https:\/\/energianucleare.eu\/wp-content\/uploads\/2026\/11\/ghana-nucleare-centrale-torri-vapore-mare.jpg","inLanguage":"en-US","potentialAction":[{"@type":"CommentAction","name":"Comment","target":["https:\/\/energianucleare.eu\/en\/ghana-earmarks-200-million-to-prepare-its-first-nuclear-power-plant\/#respond"]}]},{"@type":"WebPage","@id":"https:\/\/energianucleare.eu\/en\/ghana-earmarks-200-million-to-prepare-its-first-nuclear-power-plant\/","url":"https:\/\/energianucleare.eu\/en\/ghana-earmarks-200-million-to-prepare-its-first-nuclear-power-plant\/","name":"Ghana Earmarks $200 Million to Prepare Its First Nuclear Power Plant - Energia nucleare","isPartOf":{"@id":"https:\/\/energianucleare.eu\/en\/#website"},"primaryImageOfPage":{"@id":"https:\/\/energianucleare.eu\/en\/ghana-earmarks-200-million-to-prepare-its-first-nuclear-power-plant\/#primaryimage"},"image":{"@id":"https:\/\/energianucleare.eu\/en\/ghana-earmarks-200-million-to-prepare-its-first-nuclear-power-plant\/#primaryimage"},"thumbnailUrl":"https:\/\/energianucleare.eu\/wp-content\/uploads\/2026\/11\/ghana-nucleare-centrale-torri-vapore-mare.jpg","datePublished":"2026-11-13T07:02:37+00:00","author":{"@id":"https:\/\/energianucleare.eu\/en\/#\/schema\/person\/2c3f466ad139658dfa60c575cf287fb7"},"description":"Ghana commits $200M to its first nuclear plant: 2027-2028 readiness programme, 2,000 scientists trained, fully state-owned plant.","breadcrumb":{"@id":"https:\/\/energianucleare.eu\/en\/ghana-earmarks-200-million-to-prepare-its-first-nuclear-power-plant\/#breadcrumb"},"inLanguage":"en-US","potentialAction":[{"@type":"ReadAction","target":["https:\/\/energianucleare.eu\/en\/ghana-earmarks-200-million-to-prepare-its-first-nuclear-power-plant\/"]}]},{"@type":"ImageObject","inLanguage":"en-US","@id":"https:\/\/energianucleare.eu\/en\/ghana-earmarks-200-million-to-prepare-its-first-nuclear-power-plant\/#primaryimage","url":"https:\/\/energianucleare.eu\/wp-content\/uploads\/2026\/11\/ghana-nucleare-centrale-torri-vapore-mare.jpg","contentUrl":"https:\/\/energianucleare.eu\/wp-content\/uploads\/2026\/11\/ghana-nucleare-centrale-torri-vapore-mare.jpg","width":1536,"height":1024,"caption":"Centrale nucleare con due torri di raffreddamento in cemento che emettono vapore, cupola bianca del reattore e cielo azzurro sopra il mare"},{"@type":"BreadcrumbList","@id":"https:\/\/energianucleare.eu\/en\/ghana-earmarks-200-million-to-prepare-its-first-nuclear-power-plant\/#breadcrumb","itemListElement":[{"@type":"ListItem","position":1,"name":"Home","item":"https:\/\/energianucleare.eu\/en\/"},{"@type":"ListItem","position":2,"name":"Ghana Earmarks $200 Million to Prepare Its First Nuclear Power Plant"}]},{"@type":"WebSite","@id":"https:\/\/energianucleare.eu\/en\/#website","url":"https:\/\/energianucleare.eu\/en\/","name":"Energia nucleare","description":"Notizie sul nucleare","potentialAction":[{"@type":"SearchAction","target":{"@type":"EntryPoint","urlTemplate":"https:\/\/energianucleare.eu\/en\/?s={search_term_string}"},"query-input":{"@type":"PropertyValueSpecification","valueRequired":true,"valueName":"search_term_string"}}],"inLanguage":"en-US"},{"@type":"Person","@id":"https:\/\/energianucleare.eu\/en\/#\/schema\/person\/2c3f466ad139658dfa60c575cf287fb7","name":"Redazione Energia Nucleare","image":{"@type":"ImageObject","inLanguage":"en-US","@id":"https:\/\/secure.gravatar.com\/avatar\/f7573bf636adfceb968c63d469c0889af0a78eb4935f321c17f76df121e056a6?s=96&d=mm&r=g","url":"https:\/\/secure.gravatar.com\/avatar\/f7573bf636adfceb968c63d469c0889af0a78eb4935f321c17f76df121e056a6?s=96&d=mm&r=g","contentUrl":"https:\/\/secure.gravatar.com\/avatar\/f7573bf636adfceb968c63d469c0889af0a78eb4935f321c17f76df121e056a6?s=96&d=mm&r=g","caption":"Redazione Energia Nucleare"},"url":"https:\/\/energianucleare.eu\/en\/author\/redazione\/"}]}},"_links":{"self":[{"href":"https:\/\/energianucleare.eu\/en\/wp-json\/wp\/v2\/posts\/4619","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/energianucleare.eu\/en\/wp-json\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/energianucleare.eu\/en\/wp-json\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"https:\/\/energianucleare.eu\/en\/wp-json\/wp\/v2\/users\/25"}],"replies":[{"embeddable":true,"href":"https:\/\/energianucleare.eu\/en\/wp-json\/wp\/v2\/comments?post=4619"}],"version-history":[{"count":0,"href":"https:\/\/energianucleare.eu\/en\/wp-json\/wp\/v2\/posts\/4619\/revisions"}],"wp:featuredmedia":[{"embeddable":true,"href":"https:\/\/energianucleare.eu\/en\/wp-json\/wp\/v2\/media\/4616"}],"wp:attachment":[{"href":"https:\/\/energianucleare.eu\/en\/wp-json\/wp\/v2\/media?parent=4619"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/energianucleare.eu\/en\/wp-json\/wp\/v2\/categories?post=4619"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/energianucleare.eu\/en\/wp-json\/wp\/v2\/tags?post=4619"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}