{"id":4723,"date":"2026-11-18T20:21:30","date_gmt":"2026-11-18T19:21:30","guid":{"rendered":"https:\/\/energianucleare.eu\/esteyco-adopts-hitachi-vsp-one-block-for-iter-simulation-data\/"},"modified":"2026-11-18T20:21:30","modified_gmt":"2026-11-18T19:21:30","slug":"esteyco-adopts-hitachi-vsp-one-block-for-iter-simulation-data","status":"publish","type":"post","link":"https:\/\/energianucleare.eu\/en\/esteyco-adopts-hitachi-vsp-one-block-for-iter-simulation-data\/","title":{"rendered":"Esteyco Adopts Hitachi VSP One Block for ITER Simulation Data"},"content":{"rendered":"<p>Spanish engineering firm <strong>Esteyco<\/strong> has commissioned a new <strong>Hitachi Vantara VSP One Block<\/strong> storage infrastructure to manage the simulation data it produces for ITER, the experimental fusion reactor under construction in France. The system was built with technology partner Quadrics Sistemas and has delivered a measurable result: the maintenance window has dropped from several hours to about five minutes.<\/p>\n<p>Esteyco has worked for ITER for more than ten years. It models the behavior of critical components and carries out seismic analysis to verify that the experimental facility can operate safely. These calculations run on high-performance computing systems and take days or weeks to complete. The data they generate must remain accessible at all times and under the company&#8217;s control.<\/p>\n<p>Quadrics used VSP One Block to virtualize the existing storage environment. This avoided a lengthy migration and reduced downtime. Before the purchase, Hitachi Vantara supplied an on-site test system, allowing the engineering team to validate performance on real workloads. According to Quadrics, during testing the system handled data protection, replication and long-term retention requirements without issues.<\/p>\n<p>The resilience setup has two elements. The first is immutable snapshots: copies of data that cannot be modified, enabling rapid recovery in the event of corruption or a cyberattack. The second is a second VSP One Block system at the <strong>Barcelona<\/strong> data center, more than 500 kilometers from the main site, which Esteyco is setting up for replication.<\/p>\n<p>Data sovereignty weighed on the choice. A project like ITER involves unique engineering systems, built over years of work by scientists and technicians from multiple countries. A company supplying analysis to a program of this kind must demonstrate full control over the information it produces, and a self-managed infrastructure meets that requirement.<\/p>\n<p>For the fusion sector, the news highlights a little-seen aspect of the ITER construction effort: alongside the tokamak modules and magnets, there is a supply chain of engineering firms producing and archiving enormous volumes of simulation data. As assembly advances, those volumes will grow, and infrastructure with geographic replication and rapid recovery will become standard for the program&#8217;s suppliers.<\/p>\n","protected":false},"excerpt":{"rendered":"<p>Spanish engineering firm Esteyco, active on ITER for over a decade, has installed a Hitachi Vantara VSP One Block system built with Quadrics. The project cuts the maintenance window from hours to about five minutes and adds a second site in Barcelona.<\/p>\n","protected":false},"author":25,"featured_media":4720,"comment_status":"open","ping_status":"open","sticky":false,"template":"","format":"standard","meta":{"_acf_changed":false,"footnotes":""},"categories":[],"tags":[],"class_list":["post-4723","post","type-post","status-publish","format-standard","has-post-thumbnail","hentry"],"acf":[],"yoast_head":"<!-- This site is optimized with the Yoast SEO plugin v28.7 - https:\/\/yoast.com\/product\/yoast-seo-wordpress\/ -->\n<title>Esteyco Adopts Hitachi VSP One Block for ITER Simulation Data - Energia nucleare<\/title>\n<meta name=\"description\" content=\"Esteyco picks Hitachi VSP One Block with Quadrics for ITER simulation data: maintenance cut to five minutes and a second site in Barcelona.\" \/>\n<meta name=\"robots\" content=\"index, follow, max-snippet:-1, max-image-preview:large, max-video-preview:-1\" \/>\n<link rel=\"canonical\" href=\"https:\/\/energianucleare.eu\/en\/esteyco-adopts-hitachi-vsp-one-block-for-iter-simulation-data\/\" \/>\n<meta property=\"og:locale\" content=\"en_US\" \/>\n<meta property=\"og:type\" content=\"article\" \/>\n<meta property=\"og:title\" content=\"Esteyco Adopts Hitachi VSP One Block for ITER Simulation Data - Energia nucleare\" \/>\n<meta property=\"og:description\" content=\"Esteyco picks Hitachi VSP One Block with Quadrics for ITER simulation data: maintenance cut to five minutes and a second site in Barcelona.\" \/>\n<meta property=\"og:url\" content=\"https:\/\/energianucleare.eu\/en\/esteyco-adopts-hitachi-vsp-one-block-for-iter-simulation-data\/\" \/>\n<meta property=\"og:site_name\" content=\"Energia nucleare\" \/>\n<meta property=\"article:published_time\" content=\"2026-11-18T19:21:30+00:00\" \/>\n<meta property=\"og:image\" content=\"https:\/\/energianucleare.eu\/wp-content\/uploads\/2026\/11\/data-center-server-reattore-metallico-vetro.jpg\" \/>\n\t<meta property=\"og:image:width\" content=\"1536\" \/>\n\t<meta property=\"og:image:height\" content=\"1024\" \/>\n\t<meta property=\"og:image:type\" content=\"image\/jpeg\" \/>\n<meta name=\"author\" content=\"Redazione Energia Nucleare\" \/>\n<meta name=\"twitter:card\" content=\"summary_large_image\" \/>\n<meta name=\"twitter:label1\" content=\"Written by\" \/>\n\t<meta name=\"twitter:data1\" content=\"Redazione Energia Nucleare\" \/>\n\t<meta name=\"twitter:label2\" content=\"Est. reading time\" \/>\n\t<meta name=\"twitter:data2\" content=\"2 minutes\" \/>\n<script type=\"application\/ld+json\" class=\"yoast-schema-graph\">{\"@context\":\"https:\\\/\\\/schema.org\",\"@graph\":[{\"@type\":\"Article\",\"@id\":\"https:\\\/\\\/energianucleare.eu\\\/en\\\/esteyco-adopts-hitachi-vsp-one-block-for-iter-simulation-data\\\/#article\",\"isPartOf\":{\"@id\":\"https:\\\/\\\/energianucleare.eu\\\/en\\\/esteyco-adopts-hitachi-vsp-one-block-for-iter-simulation-data\\\/\"},\"author\":{\"name\":\"Redazione Energia Nucleare\",\"@id\":\"https:\\\/\\\/energianucleare.eu\\\/en\\\/#\\\/schema\\\/person\\\/2c3f466ad139658dfa60c575cf287fb7\"},\"headline\":\"Esteyco Adopts Hitachi VSP One Block for ITER Simulation Data\",\"datePublished\":\"2026-11-18T19:21:30+00:00\",\"mainEntityOfPage\":{\"@id\":\"https:\\\/\\\/energianucleare.eu\\\/en\\\/esteyco-adopts-hitachi-vsp-one-block-for-iter-simulation-data\\\/\"},\"wordCount\":355,\"commentCount\":0,\"image\":{\"@id\":\"https:\\\/\\\/energianucleare.eu\\\/en\\\/esteyco-adopts-hitachi-vsp-one-block-for-iter-simulation-data\\\/#primaryimage\"},\"thumbnailUrl\":\"https:\\\/\\\/energianucleare.eu\\\/wp-content\\\/uploads\\\/2026\\\/11\\\/data-center-server-reattore-metallico-vetro.jpg\",\"inLanguage\":\"en-US\",\"potentialAction\":[{\"@type\":\"CommentAction\",\"name\":\"Comment\",\"target\":[\"https:\\\/\\\/energianucleare.eu\\\/en\\\/esteyco-adopts-hitachi-vsp-one-block-for-iter-simulation-data\\\/#respond\"]}]},{\"@type\":\"WebPage\",\"@id\":\"https:\\\/\\\/energianucleare.eu\\\/en\\\/esteyco-adopts-hitachi-vsp-one-block-for-iter-simulation-data\\\/\",\"url\":\"https:\\\/\\\/energianucleare.eu\\\/en\\\/esteyco-adopts-hitachi-vsp-one-block-for-iter-simulation-data\\\/\",\"name\":\"Esteyco Adopts Hitachi VSP One Block for ITER Simulation Data - Energia nucleare\",\"isPartOf\":{\"@id\":\"https:\\\/\\\/energianucleare.eu\\\/en\\\/#website\"},\"primaryImageOfPage\":{\"@id\":\"https:\\\/\\\/energianucleare.eu\\\/en\\\/esteyco-adopts-hitachi-vsp-one-block-for-iter-simulation-data\\\/#primaryimage\"},\"image\":{\"@id\":\"https:\\\/\\\/energianucleare.eu\\\/en\\\/esteyco-adopts-hitachi-vsp-one-block-for-iter-simulation-data\\\/#primaryimage\"},\"thumbnailUrl\":\"https:\\\/\\\/energianucleare.eu\\\/wp-content\\\/uploads\\\/2026\\\/11\\\/data-center-server-reattore-metallico-vetro.jpg\",\"datePublished\":\"2026-11-18T19:21:30+00:00\",\"author\":{\"@id\":\"https:\\\/\\\/energianucleare.eu\\\/en\\\/#\\\/schema\\\/person\\\/2c3f466ad139658dfa60c575cf287fb7\"},\"description\":\"Esteyco picks Hitachi VSP One Block with Quadrics for ITER simulation data: maintenance cut to five minutes and a second site in Barcelona.\",\"breadcrumb\":{\"@id\":\"https:\\\/\\\/energianucleare.eu\\\/en\\\/esteyco-adopts-hitachi-vsp-one-block-for-iter-simulation-data\\\/#breadcrumb\"},\"inLanguage\":\"en-US\",\"potentialAction\":[{\"@type\":\"ReadAction\",\"target\":[\"https:\\\/\\\/energianucleare.eu\\\/en\\\/esteyco-adopts-hitachi-vsp-one-block-for-iter-simulation-data\\\/\"]}]},{\"@type\":\"ImageObject\",\"inLanguage\":\"en-US\",\"@id\":\"https:\\\/\\\/energianucleare.eu\\\/en\\\/esteyco-adopts-hitachi-vsp-one-block-for-iter-simulation-data\\\/#primaryimage\",\"url\":\"https:\\\/\\\/energianucleare.eu\\\/wp-content\\\/uploads\\\/2026\\\/11\\\/data-center-server-reattore-metallico-vetro.jpg\",\"contentUrl\":\"https:\\\/\\\/energianucleare.eu\\\/wp-content\\\/uploads\\\/2026\\\/11\\\/data-center-server-reattore-metallico-vetro.jpg\",\"width\":1536,\"height\":1024,\"caption\":\"Armadi server neri con luci verdi e arancioni in primo piano, con un grande reattore metallico visibile dietro una parete di vetro\"},{\"@type\":\"BreadcrumbList\",\"@id\":\"https:\\\/\\\/energianucleare.eu\\\/en\\\/esteyco-adopts-hitachi-vsp-one-block-for-iter-simulation-data\\\/#breadcrumb\",\"itemListElement\":[{\"@type\":\"ListItem\",\"position\":1,\"name\":\"Home\",\"item\":\"https:\\\/\\\/energianucleare.eu\\\/en\\\/\"},{\"@type\":\"ListItem\",\"position\":2,\"name\":\"Esteyco Adopts Hitachi VSP One Block for ITER Simulation Data\"}]},{\"@type\":\"WebSite\",\"@id\":\"https:\\\/\\\/energianucleare.eu\\\/en\\\/#website\",\"url\":\"https:\\\/\\\/energianucleare.eu\\\/en\\\/\",\"name\":\"Energia nucleare\",\"description\":\"Notizie sul nucleare\",\"potentialAction\":[{\"@type\":\"SearchAction\",\"target\":{\"@type\":\"EntryPoint\",\"urlTemplate\":\"https:\\\/\\\/energianucleare.eu\\\/en\\\/?s={search_term_string}\"},\"query-input\":{\"@type\":\"PropertyValueSpecification\",\"valueRequired\":true,\"valueName\":\"search_term_string\"}}],\"inLanguage\":\"en-US\"},{\"@type\":\"Person\",\"@id\":\"https:\\\/\\\/energianucleare.eu\\\/en\\\/#\\\/schema\\\/person\\\/2c3f466ad139658dfa60c575cf287fb7\",\"name\":\"Redazione Energia Nucleare\",\"image\":{\"@type\":\"ImageObject\",\"inLanguage\":\"en-US\",\"@id\":\"https:\\\/\\\/secure.gravatar.com\\\/avatar\\\/f7573bf636adfceb968c63d469c0889af0a78eb4935f321c17f76df121e056a6?s=96&d=mm&r=g\",\"url\":\"https:\\\/\\\/secure.gravatar.com\\\/avatar\\\/f7573bf636adfceb968c63d469c0889af0a78eb4935f321c17f76df121e056a6?s=96&d=mm&r=g\",\"contentUrl\":\"https:\\\/\\\/secure.gravatar.com\\\/avatar\\\/f7573bf636adfceb968c63d469c0889af0a78eb4935f321c17f76df121e056a6?s=96&d=mm&r=g\",\"caption\":\"Redazione Energia Nucleare\"},\"url\":\"https:\\\/\\\/energianucleare.eu\\\/en\\\/author\\\/redazione\\\/\"}]}<\/script>\n<!-- \/ Yoast SEO plugin. -->","yoast_head_json":{"title":"Esteyco Adopts Hitachi VSP One Block for ITER Simulation Data - Energia nucleare","description":"Esteyco picks Hitachi VSP One Block with Quadrics for ITER simulation data: maintenance cut to five minutes and a second site in Barcelona.","robots":{"index":"index","follow":"follow","max-snippet":"max-snippet:-1","max-image-preview":"max-image-preview:large","max-video-preview":"max-video-preview:-1"},"canonical":"https:\/\/energianucleare.eu\/en\/esteyco-adopts-hitachi-vsp-one-block-for-iter-simulation-data\/","og_locale":"en_US","og_type":"article","og_title":"Esteyco Adopts Hitachi VSP One Block for ITER Simulation Data - Energia nucleare","og_description":"Esteyco picks Hitachi VSP One Block with Quadrics for ITER simulation data: maintenance cut to five minutes and a second site in Barcelona.","og_url":"https:\/\/energianucleare.eu\/en\/esteyco-adopts-hitachi-vsp-one-block-for-iter-simulation-data\/","og_site_name":"Energia nucleare","article_published_time":"2026-11-18T19:21:30+00:00","og_image":[{"width":1536,"height":1024,"url":"https:\/\/energianucleare.eu\/wp-content\/uploads\/2026\/11\/data-center-server-reattore-metallico-vetro.jpg","type":"image\/jpeg"}],"author":"Redazione Energia Nucleare","twitter_card":"summary_large_image","twitter_misc":{"Written by":"Redazione Energia Nucleare","Est. reading time":"2 minutes"},"schema":{"@context":"https:\/\/schema.org","@graph":[{"@type":"Article","@id":"https:\/\/energianucleare.eu\/en\/esteyco-adopts-hitachi-vsp-one-block-for-iter-simulation-data\/#article","isPartOf":{"@id":"https:\/\/energianucleare.eu\/en\/esteyco-adopts-hitachi-vsp-one-block-for-iter-simulation-data\/"},"author":{"name":"Redazione Energia Nucleare","@id":"https:\/\/energianucleare.eu\/en\/#\/schema\/person\/2c3f466ad139658dfa60c575cf287fb7"},"headline":"Esteyco Adopts Hitachi VSP One Block for ITER Simulation Data","datePublished":"2026-11-18T19:21:30+00:00","mainEntityOfPage":{"@id":"https:\/\/energianucleare.eu\/en\/esteyco-adopts-hitachi-vsp-one-block-for-iter-simulation-data\/"},"wordCount":355,"commentCount":0,"image":{"@id":"https:\/\/energianucleare.eu\/en\/esteyco-adopts-hitachi-vsp-one-block-for-iter-simulation-data\/#primaryimage"},"thumbnailUrl":"https:\/\/energianucleare.eu\/wp-content\/uploads\/2026\/11\/data-center-server-reattore-metallico-vetro.jpg","inLanguage":"en-US","potentialAction":[{"@type":"CommentAction","name":"Comment","target":["https:\/\/energianucleare.eu\/en\/esteyco-adopts-hitachi-vsp-one-block-for-iter-simulation-data\/#respond"]}]},{"@type":"WebPage","@id":"https:\/\/energianucleare.eu\/en\/esteyco-adopts-hitachi-vsp-one-block-for-iter-simulation-data\/","url":"https:\/\/energianucleare.eu\/en\/esteyco-adopts-hitachi-vsp-one-block-for-iter-simulation-data\/","name":"Esteyco Adopts Hitachi VSP One Block for ITER Simulation Data - Energia nucleare","isPartOf":{"@id":"https:\/\/energianucleare.eu\/en\/#website"},"primaryImageOfPage":{"@id":"https:\/\/energianucleare.eu\/en\/esteyco-adopts-hitachi-vsp-one-block-for-iter-simulation-data\/#primaryimage"},"image":{"@id":"https:\/\/energianucleare.eu\/en\/esteyco-adopts-hitachi-vsp-one-block-for-iter-simulation-data\/#primaryimage"},"thumbnailUrl":"https:\/\/energianucleare.eu\/wp-content\/uploads\/2026\/11\/data-center-server-reattore-metallico-vetro.jpg","datePublished":"2026-11-18T19:21:30+00:00","author":{"@id":"https:\/\/energianucleare.eu\/en\/#\/schema\/person\/2c3f466ad139658dfa60c575cf287fb7"},"description":"Esteyco picks Hitachi VSP One Block with Quadrics for ITER simulation data: maintenance cut to five minutes and a second site in Barcelona.","breadcrumb":{"@id":"https:\/\/energianucleare.eu\/en\/esteyco-adopts-hitachi-vsp-one-block-for-iter-simulation-data\/#breadcrumb"},"inLanguage":"en-US","potentialAction":[{"@type":"ReadAction","target":["https:\/\/energianucleare.eu\/en\/esteyco-adopts-hitachi-vsp-one-block-for-iter-simulation-data\/"]}]},{"@type":"ImageObject","inLanguage":"en-US","@id":"https:\/\/energianucleare.eu\/en\/esteyco-adopts-hitachi-vsp-one-block-for-iter-simulation-data\/#primaryimage","url":"https:\/\/energianucleare.eu\/wp-content\/uploads\/2026\/11\/data-center-server-reattore-metallico-vetro.jpg","contentUrl":"https:\/\/energianucleare.eu\/wp-content\/uploads\/2026\/11\/data-center-server-reattore-metallico-vetro.jpg","width":1536,"height":1024,"caption":"Armadi server neri con luci verdi e arancioni in primo piano, con un grande reattore metallico visibile dietro una parete di vetro"},{"@type":"BreadcrumbList","@id":"https:\/\/energianucleare.eu\/en\/esteyco-adopts-hitachi-vsp-one-block-for-iter-simulation-data\/#breadcrumb","itemListElement":[{"@type":"ListItem","position":1,"name":"Home","item":"https:\/\/energianucleare.eu\/en\/"},{"@type":"ListItem","position":2,"name":"Esteyco Adopts Hitachi VSP One Block for ITER Simulation Data"}]},{"@type":"WebSite","@id":"https:\/\/energianucleare.eu\/en\/#website","url":"https:\/\/energianucleare.eu\/en\/","name":"Energia nucleare","description":"Notizie sul nucleare","potentialAction":[{"@type":"SearchAction","target":{"@type":"EntryPoint","urlTemplate":"https:\/\/energianucleare.eu\/en\/?s={search_term_string}"},"query-input":{"@type":"PropertyValueSpecification","valueRequired":true,"valueName":"search_term_string"}}],"inLanguage":"en-US"},{"@type":"Person","@id":"https:\/\/energianucleare.eu\/en\/#\/schema\/person\/2c3f466ad139658dfa60c575cf287fb7","name":"Redazione Energia Nucleare","image":{"@type":"ImageObject","inLanguage":"en-US","@id":"https:\/\/secure.gravatar.com\/avatar\/f7573bf636adfceb968c63d469c0889af0a78eb4935f321c17f76df121e056a6?s=96&d=mm&r=g","url":"https:\/\/secure.gravatar.com\/avatar\/f7573bf636adfceb968c63d469c0889af0a78eb4935f321c17f76df121e056a6?s=96&d=mm&r=g","contentUrl":"https:\/\/secure.gravatar.com\/avatar\/f7573bf636adfceb968c63d469c0889af0a78eb4935f321c17f76df121e056a6?s=96&d=mm&r=g","caption":"Redazione Energia Nucleare"},"url":"https:\/\/energianucleare.eu\/en\/author\/redazione\/"}]}},"_links":{"self":[{"href":"https:\/\/energianucleare.eu\/en\/wp-json\/wp\/v2\/posts\/4723","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/energianucleare.eu\/en\/wp-json\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/energianucleare.eu\/en\/wp-json\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"https:\/\/energianucleare.eu\/en\/wp-json\/wp\/v2\/users\/25"}],"replies":[{"embeddable":true,"href":"https:\/\/energianucleare.eu\/en\/wp-json\/wp\/v2\/comments?post=4723"}],"version-history":[{"count":0,"href":"https:\/\/energianucleare.eu\/en\/wp-json\/wp\/v2\/posts\/4723\/revisions"}],"wp:featuredmedia":[{"embeddable":true,"href":"https:\/\/energianucleare.eu\/en\/wp-json\/wp\/v2\/media\/4720"}],"wp:attachment":[{"href":"https:\/\/energianucleare.eu\/en\/wp-json\/wp\/v2\/media?parent=4723"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/energianucleare.eu\/en\/wp-json\/wp\/v2\/categories?post=4723"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/energianucleare.eu\/en\/wp-json\/wp\/v2\/tags?post=4723"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}