{"id":4827,"date":"2026-11-23T08:09:06","date_gmt":"2026-11-23T07:09:06","guid":{"rendered":"https:\/\/energianucleare.eu\/nextera-no-2-us-nuclear-operator-positioned-for-the-ai-data-center-power-race\/"},"modified":"2026-11-23T08:09:06","modified_gmt":"2026-11-23T07:09:06","slug":"nextera-no-2-us-nuclear-operator-positioned-for-the-ai-data-center-power-race","status":"publish","type":"post","link":"https:\/\/energianucleare.eu\/en\/nextera-no-2-us-nuclear-operator-positioned-for-the-ai-data-center-power-race\/","title":{"rendered":"NextEra, No. 2 US Nuclear Operator, Positioned for the AI Data Center Power Race"},"content":{"rendered":"<p>In AI data centers, the real asset to buy is electricity. That is the view of <strong>Stifel<\/strong>, whose analyst Jonathan Siegmann has pointed to <strong>SpaceX<\/strong> as a possible buyer of idle facilities, on one condition: that they already have a dedicated power supply contract.<\/p>\n<p>Stifel&#8217;s note reiterates a &#8220;Buy&#8221; rating on SpaceX with a price target of $190. According to the analyst, the company has an investment-grade balance sheet and roughly $40 billion in GPU financing, structured through a vehicle managed by Apollo Global Management. It could therefore take over projects slowed by permitting or funding issues, provided the power is already assured. A site with a grid connection saves years of construction.<\/p>\n<p>In this scenario, nuclear occupies a specific position. <strong>NextEra Energy<\/strong>, one of the world&#8217;s largest utilities, is the second-largest nuclear power producer in the United States. It also holds a stake in <strong>Westinghouse<\/strong>, one of the leading service providers to the nuclear industry, with operations in North America, South America and Europe. Analysts see it as well placed to serve data centers connecting to the grid, both inside and outside the regulated perimeter.<\/p>\n<p>Big tech companies have already chosen the nuclear route for their campuses. According to data compiled by Irish Dentist, Amazon is targeting 960 MW, Google has contracted 500 MW of small modular reactors from <strong>Kairos Power<\/strong> by 2035, and Meta has signed agreements for up to 1.2 GW of nuclear power. Unlike large custom-built plants, SMRs are built in series and installed close to the load. For the 2030s they are considered the most relevant solution for powering standalone campuses.<\/p>\n<p>The reason is technical. A data center consumes power around the clock, and nuclear reactors produce continuously at full output. This match between load and generation explains the interest from hyperscalers and investors. The International Energy Agency&#8217;s report on data center emissions to 2030 points to a share of nuclear alongside renewables for the European Union, while in the United States gas remains the dominant source, at around 60% of electricity.<\/p>\n<p>That gap is the space in which nuclear can grow. If a data center&#8217;s value depends on guaranteed power, sites with long-term contracts on existing reactors or SMRs will become the most contested assets. Utilities with a nuclear fleet and technology suppliers such as Westinghouse find themselves at the center of this demand.<\/p>\n","protected":false},"excerpt":{"rendered":"<p>Stifel says electricity is the key asset in AI data centers, and SpaceX could buy only sites with power already secured. NextEra Energy, the second-largest US nuclear generator with a stake in Westinghouse, stands to benefit from the demand.<\/p>\n","protected":false},"author":25,"featured_media":4824,"comment_status":"open","ping_status":"open","sticky":false,"template":"","format":"standard","meta":{"_acf_changed":false,"footnotes":""},"categories":[],"tags":[],"class_list":["post-4827","post","type-post","status-publish","format-standard","has-post-thumbnail","hentry"],"acf":[],"yoast_head":"<!-- This site is optimized with the Yoast SEO plugin v28.7 - https:\/\/yoast.com\/product\/yoast-seo-wordpress\/ -->\n<title>NextEra, No. 2 US Nuclear Operator, Positioned for the AI Data Center Power Race - Energia nucleare<\/title>\n<meta name=\"description\" content=\"Stifel: in AI data centers, power is the asset. NextEra, No. 2 US nuclear operator, and the SMR deals by Google, Amazon and Meta.\" \/>\n<meta name=\"robots\" content=\"index, follow, max-snippet:-1, max-image-preview:large, max-video-preview:-1\" \/>\n<link rel=\"canonical\" href=\"https:\/\/energianucleare.eu\/en\/nextera-no-2-us-nuclear-operator-positioned-for-the-ai-data-center-power-race\/\" \/>\n<meta property=\"og:locale\" content=\"en_US\" \/>\n<meta property=\"og:type\" content=\"article\" \/>\n<meta property=\"og:title\" content=\"NextEra, No. 2 US Nuclear Operator, Positioned for the AI Data Center Power Race - Energia nucleare\" \/>\n<meta property=\"og:description\" content=\"Stifel: in AI data centers, power is the asset. NextEra, No. 2 US nuclear operator, and the SMR deals by Google, Amazon and Meta.\" \/>\n<meta property=\"og:url\" content=\"https:\/\/energianucleare.eu\/en\/nextera-no-2-us-nuclear-operator-positioned-for-the-ai-data-center-power-race\/\" \/>\n<meta property=\"og:site_name\" content=\"Energia nucleare\" \/>\n<meta property=\"article:published_time\" content=\"2026-11-23T07:09:06+00:00\" \/>\n<meta property=\"og:image\" content=\"https:\/\/energianucleare.eu\/wp-content\/uploads\/2026\/11\/nucleare-centrale-torre-vapore-fiume.jpg\" \/>\n\t<meta property=\"og:image:width\" content=\"1536\" \/>\n\t<meta property=\"og:image:height\" content=\"1024\" \/>\n\t<meta property=\"og:image:type\" content=\"image\/jpeg\" \/>\n<meta name=\"author\" content=\"Redazione Energia Nucleare\" \/>\n<meta name=\"twitter:card\" content=\"summary_large_image\" \/>\n<meta name=\"twitter:label1\" content=\"Written by\" \/>\n\t<meta name=\"twitter:data1\" content=\"Redazione Energia Nucleare\" \/>\n\t<meta name=\"twitter:label2\" content=\"Est. reading time\" \/>\n\t<meta name=\"twitter:data2\" content=\"2 minutes\" \/>\n<script type=\"application\/ld+json\" class=\"yoast-schema-graph\">{\"@context\":\"https:\\\/\\\/schema.org\",\"@graph\":[{\"@type\":\"Article\",\"@id\":\"https:\\\/\\\/energianucleare.eu\\\/en\\\/nextera-no-2-us-nuclear-operator-positioned-for-the-ai-data-center-power-race\\\/#article\",\"isPartOf\":{\"@id\":\"https:\\\/\\\/energianucleare.eu\\\/en\\\/nextera-no-2-us-nuclear-operator-positioned-for-the-ai-data-center-power-race\\\/\"},\"author\":{\"name\":\"Redazione Energia Nucleare\",\"@id\":\"https:\\\/\\\/energianucleare.eu\\\/en\\\/#\\\/schema\\\/person\\\/2c3f466ad139658dfa60c575cf287fb7\"},\"headline\":\"NextEra, No. 2 US Nuclear Operator, Positioned for the AI Data Center Power Race\",\"datePublished\":\"2026-11-23T07:09:06+00:00\",\"mainEntityOfPage\":{\"@id\":\"https:\\\/\\\/energianucleare.eu\\\/en\\\/nextera-no-2-us-nuclear-operator-positioned-for-the-ai-data-center-power-race\\\/\"},\"wordCount\":399,\"commentCount\":0,\"image\":{\"@id\":\"https:\\\/\\\/energianucleare.eu\\\/en\\\/nextera-no-2-us-nuclear-operator-positioned-for-the-ai-data-center-power-race\\\/#primaryimage\"},\"thumbnailUrl\":\"https:\\\/\\\/energianucleare.eu\\\/wp-content\\\/uploads\\\/2026\\\/11\\\/nucleare-centrale-torre-vapore-fiume.jpg\",\"inLanguage\":\"en-US\",\"potentialAction\":[{\"@type\":\"CommentAction\",\"name\":\"Comment\",\"target\":[\"https:\\\/\\\/energianucleare.eu\\\/en\\\/nextera-no-2-us-nuclear-operator-positioned-for-the-ai-data-center-power-race\\\/#respond\"]}]},{\"@type\":\"WebPage\",\"@id\":\"https:\\\/\\\/energianucleare.eu\\\/en\\\/nextera-no-2-us-nuclear-operator-positioned-for-the-ai-data-center-power-race\\\/\",\"url\":\"https:\\\/\\\/energianucleare.eu\\\/en\\\/nextera-no-2-us-nuclear-operator-positioned-for-the-ai-data-center-power-race\\\/\",\"name\":\"NextEra, No. 2 US Nuclear Operator, Positioned for the AI Data Center Power Race - Energia nucleare\",\"isPartOf\":{\"@id\":\"https:\\\/\\\/energianucleare.eu\\\/en\\\/#website\"},\"primaryImageOfPage\":{\"@id\":\"https:\\\/\\\/energianucleare.eu\\\/en\\\/nextera-no-2-us-nuclear-operator-positioned-for-the-ai-data-center-power-race\\\/#primaryimage\"},\"image\":{\"@id\":\"https:\\\/\\\/energianucleare.eu\\\/en\\\/nextera-no-2-us-nuclear-operator-positioned-for-the-ai-data-center-power-race\\\/#primaryimage\"},\"thumbnailUrl\":\"https:\\\/\\\/energianucleare.eu\\\/wp-content\\\/uploads\\\/2026\\\/11\\\/nucleare-centrale-torre-vapore-fiume.jpg\",\"datePublished\":\"2026-11-23T07:09:06+00:00\",\"author\":{\"@id\":\"https:\\\/\\\/energianucleare.eu\\\/en\\\/#\\\/schema\\\/person\\\/2c3f466ad139658dfa60c575cf287fb7\"},\"description\":\"Stifel: in AI data centers, power is the asset. NextEra, No. 2 US nuclear operator, and the SMR deals by Google, Amazon and Meta.\",\"breadcrumb\":{\"@id\":\"https:\\\/\\\/energianucleare.eu\\\/en\\\/nextera-no-2-us-nuclear-operator-positioned-for-the-ai-data-center-power-race\\\/#breadcrumb\"},\"inLanguage\":\"en-US\",\"potentialAction\":[{\"@type\":\"ReadAction\",\"target\":[\"https:\\\/\\\/energianucleare.eu\\\/en\\\/nextera-no-2-us-nuclear-operator-positioned-for-the-ai-data-center-power-race\\\/\"]}]},{\"@type\":\"ImageObject\",\"inLanguage\":\"en-US\",\"@id\":\"https:\\\/\\\/energianucleare.eu\\\/en\\\/nextera-no-2-us-nuclear-operator-positioned-for-the-ai-data-center-power-race\\\/#primaryimage\",\"url\":\"https:\\\/\\\/energianucleare.eu\\\/wp-content\\\/uploads\\\/2026\\\/11\\\/nucleare-centrale-torre-vapore-fiume.jpg\",\"contentUrl\":\"https:\\\/\\\/energianucleare.eu\\\/wp-content\\\/uploads\\\/2026\\\/11\\\/nucleare-centrale-torre-vapore-fiume.jpg\",\"width\":1536,\"height\":1024,\"caption\":\"Centrale nucleare con torre di raffreddamento bianca che emette vapore, affiancata da un traliccio dell'alta tensione lungo un fiume\"},{\"@type\":\"BreadcrumbList\",\"@id\":\"https:\\\/\\\/energianucleare.eu\\\/en\\\/nextera-no-2-us-nuclear-operator-positioned-for-the-ai-data-center-power-race\\\/#breadcrumb\",\"itemListElement\":[{\"@type\":\"ListItem\",\"position\":1,\"name\":\"Home\",\"item\":\"https:\\\/\\\/energianucleare.eu\\\/en\\\/\"},{\"@type\":\"ListItem\",\"position\":2,\"name\":\"NextEra, No. 2 US Nuclear Operator, Positioned for the AI Data Center Power Race\"}]},{\"@type\":\"WebSite\",\"@id\":\"https:\\\/\\\/energianucleare.eu\\\/en\\\/#website\",\"url\":\"https:\\\/\\\/energianucleare.eu\\\/en\\\/\",\"name\":\"Energia nucleare\",\"description\":\"Notizie sul nucleare\",\"potentialAction\":[{\"@type\":\"SearchAction\",\"target\":{\"@type\":\"EntryPoint\",\"urlTemplate\":\"https:\\\/\\\/energianucleare.eu\\\/en\\\/?s={search_term_string}\"},\"query-input\":{\"@type\":\"PropertyValueSpecification\",\"valueRequired\":true,\"valueName\":\"search_term_string\"}}],\"inLanguage\":\"en-US\"},{\"@type\":\"Person\",\"@id\":\"https:\\\/\\\/energianucleare.eu\\\/en\\\/#\\\/schema\\\/person\\\/2c3f466ad139658dfa60c575cf287fb7\",\"name\":\"Redazione Energia Nucleare\",\"image\":{\"@type\":\"ImageObject\",\"inLanguage\":\"en-US\",\"@id\":\"https:\\\/\\\/secure.gravatar.com\\\/avatar\\\/f7573bf636adfceb968c63d469c0889af0a78eb4935f321c17f76df121e056a6?s=96&d=mm&r=g\",\"url\":\"https:\\\/\\\/secure.gravatar.com\\\/avatar\\\/f7573bf636adfceb968c63d469c0889af0a78eb4935f321c17f76df121e056a6?s=96&d=mm&r=g\",\"contentUrl\":\"https:\\\/\\\/secure.gravatar.com\\\/avatar\\\/f7573bf636adfceb968c63d469c0889af0a78eb4935f321c17f76df121e056a6?s=96&d=mm&r=g\",\"caption\":\"Redazione Energia Nucleare\"},\"url\":\"https:\\\/\\\/energianucleare.eu\\\/en\\\/author\\\/redazione\\\/\"}]}<\/script>\n<!-- \/ Yoast SEO plugin. -->","yoast_head_json":{"title":"NextEra, No. 2 US Nuclear Operator, Positioned for the AI Data Center Power Race - Energia nucleare","description":"Stifel: in AI data centers, power is the asset. NextEra, No. 2 US nuclear operator, and the SMR deals by Google, Amazon and Meta.","robots":{"index":"index","follow":"follow","max-snippet":"max-snippet:-1","max-image-preview":"max-image-preview:large","max-video-preview":"max-video-preview:-1"},"canonical":"https:\/\/energianucleare.eu\/en\/nextera-no-2-us-nuclear-operator-positioned-for-the-ai-data-center-power-race\/","og_locale":"en_US","og_type":"article","og_title":"NextEra, No. 2 US Nuclear Operator, Positioned for the AI Data Center Power Race - Energia nucleare","og_description":"Stifel: in AI data centers, power is the asset. NextEra, No. 2 US nuclear operator, and the SMR deals by Google, Amazon and Meta.","og_url":"https:\/\/energianucleare.eu\/en\/nextera-no-2-us-nuclear-operator-positioned-for-the-ai-data-center-power-race\/","og_site_name":"Energia nucleare","article_published_time":"2026-11-23T07:09:06+00:00","og_image":[{"width":1536,"height":1024,"url":"https:\/\/energianucleare.eu\/wp-content\/uploads\/2026\/11\/nucleare-centrale-torre-vapore-fiume.jpg","type":"image\/jpeg"}],"author":"Redazione Energia Nucleare","twitter_card":"summary_large_image","twitter_misc":{"Written by":"Redazione Energia Nucleare","Est. reading time":"2 minutes"},"schema":{"@context":"https:\/\/schema.org","@graph":[{"@type":"Article","@id":"https:\/\/energianucleare.eu\/en\/nextera-no-2-us-nuclear-operator-positioned-for-the-ai-data-center-power-race\/#article","isPartOf":{"@id":"https:\/\/energianucleare.eu\/en\/nextera-no-2-us-nuclear-operator-positioned-for-the-ai-data-center-power-race\/"},"author":{"name":"Redazione Energia Nucleare","@id":"https:\/\/energianucleare.eu\/en\/#\/schema\/person\/2c3f466ad139658dfa60c575cf287fb7"},"headline":"NextEra, No. 2 US Nuclear Operator, Positioned for the AI Data Center Power Race","datePublished":"2026-11-23T07:09:06+00:00","mainEntityOfPage":{"@id":"https:\/\/energianucleare.eu\/en\/nextera-no-2-us-nuclear-operator-positioned-for-the-ai-data-center-power-race\/"},"wordCount":399,"commentCount":0,"image":{"@id":"https:\/\/energianucleare.eu\/en\/nextera-no-2-us-nuclear-operator-positioned-for-the-ai-data-center-power-race\/#primaryimage"},"thumbnailUrl":"https:\/\/energianucleare.eu\/wp-content\/uploads\/2026\/11\/nucleare-centrale-torre-vapore-fiume.jpg","inLanguage":"en-US","potentialAction":[{"@type":"CommentAction","name":"Comment","target":["https:\/\/energianucleare.eu\/en\/nextera-no-2-us-nuclear-operator-positioned-for-the-ai-data-center-power-race\/#respond"]}]},{"@type":"WebPage","@id":"https:\/\/energianucleare.eu\/en\/nextera-no-2-us-nuclear-operator-positioned-for-the-ai-data-center-power-race\/","url":"https:\/\/energianucleare.eu\/en\/nextera-no-2-us-nuclear-operator-positioned-for-the-ai-data-center-power-race\/","name":"NextEra, No. 2 US Nuclear Operator, Positioned for the AI Data Center Power Race - Energia nucleare","isPartOf":{"@id":"https:\/\/energianucleare.eu\/en\/#website"},"primaryImageOfPage":{"@id":"https:\/\/energianucleare.eu\/en\/nextera-no-2-us-nuclear-operator-positioned-for-the-ai-data-center-power-race\/#primaryimage"},"image":{"@id":"https:\/\/energianucleare.eu\/en\/nextera-no-2-us-nuclear-operator-positioned-for-the-ai-data-center-power-race\/#primaryimage"},"thumbnailUrl":"https:\/\/energianucleare.eu\/wp-content\/uploads\/2026\/11\/nucleare-centrale-torre-vapore-fiume.jpg","datePublished":"2026-11-23T07:09:06+00:00","author":{"@id":"https:\/\/energianucleare.eu\/en\/#\/schema\/person\/2c3f466ad139658dfa60c575cf287fb7"},"description":"Stifel: in AI data centers, power is the asset. NextEra, No. 2 US nuclear operator, and the SMR deals by Google, Amazon and Meta.","breadcrumb":{"@id":"https:\/\/energianucleare.eu\/en\/nextera-no-2-us-nuclear-operator-positioned-for-the-ai-data-center-power-race\/#breadcrumb"},"inLanguage":"en-US","potentialAction":[{"@type":"ReadAction","target":["https:\/\/energianucleare.eu\/en\/nextera-no-2-us-nuclear-operator-positioned-for-the-ai-data-center-power-race\/"]}]},{"@type":"ImageObject","inLanguage":"en-US","@id":"https:\/\/energianucleare.eu\/en\/nextera-no-2-us-nuclear-operator-positioned-for-the-ai-data-center-power-race\/#primaryimage","url":"https:\/\/energianucleare.eu\/wp-content\/uploads\/2026\/11\/nucleare-centrale-torre-vapore-fiume.jpg","contentUrl":"https:\/\/energianucleare.eu\/wp-content\/uploads\/2026\/11\/nucleare-centrale-torre-vapore-fiume.jpg","width":1536,"height":1024,"caption":"Centrale nucleare con torre di raffreddamento bianca che emette vapore, affiancata da un traliccio dell'alta tensione lungo un fiume"},{"@type":"BreadcrumbList","@id":"https:\/\/energianucleare.eu\/en\/nextera-no-2-us-nuclear-operator-positioned-for-the-ai-data-center-power-race\/#breadcrumb","itemListElement":[{"@type":"ListItem","position":1,"name":"Home","item":"https:\/\/energianucleare.eu\/en\/"},{"@type":"ListItem","position":2,"name":"NextEra, No. 2 US Nuclear Operator, Positioned for the AI Data Center Power Race"}]},{"@type":"WebSite","@id":"https:\/\/energianucleare.eu\/en\/#website","url":"https:\/\/energianucleare.eu\/en\/","name":"Energia nucleare","description":"Notizie sul nucleare","potentialAction":[{"@type":"SearchAction","target":{"@type":"EntryPoint","urlTemplate":"https:\/\/energianucleare.eu\/en\/?s={search_term_string}"},"query-input":{"@type":"PropertyValueSpecification","valueRequired":true,"valueName":"search_term_string"}}],"inLanguage":"en-US"},{"@type":"Person","@id":"https:\/\/energianucleare.eu\/en\/#\/schema\/person\/2c3f466ad139658dfa60c575cf287fb7","name":"Redazione Energia Nucleare","image":{"@type":"ImageObject","inLanguage":"en-US","@id":"https:\/\/secure.gravatar.com\/avatar\/f7573bf636adfceb968c63d469c0889af0a78eb4935f321c17f76df121e056a6?s=96&d=mm&r=g","url":"https:\/\/secure.gravatar.com\/avatar\/f7573bf636adfceb968c63d469c0889af0a78eb4935f321c17f76df121e056a6?s=96&d=mm&r=g","contentUrl":"https:\/\/secure.gravatar.com\/avatar\/f7573bf636adfceb968c63d469c0889af0a78eb4935f321c17f76df121e056a6?s=96&d=mm&r=g","caption":"Redazione Energia Nucleare"},"url":"https:\/\/energianucleare.eu\/en\/author\/redazione\/"}]}},"_links":{"self":[{"href":"https:\/\/energianucleare.eu\/en\/wp-json\/wp\/v2\/posts\/4827","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/energianucleare.eu\/en\/wp-json\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/energianucleare.eu\/en\/wp-json\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"https:\/\/energianucleare.eu\/en\/wp-json\/wp\/v2\/users\/25"}],"replies":[{"embeddable":true,"href":"https:\/\/energianucleare.eu\/en\/wp-json\/wp\/v2\/comments?post=4827"}],"version-history":[{"count":0,"href":"https:\/\/energianucleare.eu\/en\/wp-json\/wp\/v2\/posts\/4827\/revisions"}],"wp:featuredmedia":[{"embeddable":true,"href":"https:\/\/energianucleare.eu\/en\/wp-json\/wp\/v2\/media\/4824"}],"wp:attachment":[{"href":"https:\/\/energianucleare.eu\/en\/wp-json\/wp\/v2\/media?parent=4827"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/energianucleare.eu\/en\/wp-json\/wp\/v2\/categories?post=4827"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/energianucleare.eu\/en\/wp-json\/wp\/v2\/tags?post=4827"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}