Home Global Uranium Identifies Priority Zone for…

Global Uranium Identifies Priority Zone for Ground EM at Astro Project

Global Uranium’s ambient noise tomography (ANT) survey at the Astro project in the Athabasca Basin points to the northeastern part of the AS-1 anomaly as a priority area. The ground electromagnetic campaign will be concentrated there ahead of the first exploration drill holes.

Global Uranium Identifies Priority Zone for Ground EM at Astro Project

Global Uranium has released the results of the 2026 ambient noise tomography (ANT) survey at the Astro project in the eastern Athabasca Basin, Saskatchewan. The survey identifies the northeastern sector of the AS-1 anomaly as a priority area for a ground electromagnetic (EM) campaign.

The ANT model, built from data recorded at 298 seismic stations, shows a zone of lower seismic velocity within the sandstone. The zone follows part of the edge of the basement conductive trend already mapped by the 2025 airborne ZTEM survey. The two datasets point to the same stretch of AS-1: one from the sandstone, the other from the conductivity of the underlying basement. The model also indicates up to 250 metres of relief at the sandstone-basement contact, which may reflect structural offsets. Faulting or hydrothermal alteration could explain the reduced velocities.

The AS-1 trend extends for roughly 15 kilometres within a conductive corridor about 25 kilometres long. It was selected for follow-up work because of its conductive response and bends in its orientation, which can indicate geological structure. This setting is common to many eastern Athabasca deposits. Astro lies 28 kilometres west of the McArthur River uranium mine. The surveys were processed by CAUR Technologies, a Canadian company based in Québec, and the model was validated by comparing estimated depths with those of three historical drill holes: the discrepancy at the base of the sandstone stayed within 35 metres.

CEO Ungad Chadda said the survey shows where the sandstone meets the eastern conductor, and that is where the company intends to concentrate ground EM. Global Uranium funded the survey and supporting work. The project is operated by Cosa Resources, which has also released the results and plans to use the two datasets to better define targets for the first drilling program. According to Cosa, the ground campaign is planned for 2027. Global Uranium earned an initial 20% interest in Astro by completing the first phase of the option agreement with Cosa.

To fund the ground EM, the company has announced a C$1.5 million flow-through offering at C$0.70 per unit. If the offering closes, the proceeds will go to the field program. Contractor availability and the timing of the work remain to be confirmed. The EM results will show whether the zone identified by the seismic survey deserves to become a drill target.

The Athabasca Basin hosts some of the highest-grade uranium deposits in the world. Every new area defined through geophysical methods expands the pool of projects that can feed the reactor fuel supply chain in the coming years.

Related articles